Slope Stabilization on Chemin Léonard by Construction FGK
Municipalité de Lac-Du-Cerf · Awarded contract
AwardedSlope Stabilization on Chemin Léonard by Construction FGK
Awarded Unknown
AwardedNot specified
Value$303,215.88
SupplierCONSTRUCTION FGK INCORPORÉE
ProvinceQuebec
CategoryInfrastructure
About
Municipalité de Lac-Du-Cerf awarded a contract to Construction FGK Incorporée for slope stabilization on Chemin Léonard, with a contract value of CAD 303,215.88.
The work falls under paving, asphalting, and infrastructure construction categories.
Similar open tenders12
TenderCloses
Rock Face Stabilisation on Chemin de la RivièreInfrastructure
24 Nov 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Installation of New Safety Guardrails on Chemin du Lac Rapide, Lac‑Pythonga (Outaouais)Infrastructure
20 Nov 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Enhancement of St-Constant Water Tower — Paving, Asphalting & Infrastructure WorksWater & Sanitation
03 Dec 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Slope Stabilization Work on Chemin des RapidesInfrastructureCONSTRUCTION FGK INCORPORÉE
$299,252.53
Slope Stabilization on Riverside Road in La PêcheInfrastructureCONSTRUCTION FGK INCORPORÉE
$1,121,030.72
Slope Stabilization on Chemin de Nicolet-FallsInfrastructureEXCAVATIONS GAGNON ET FRÈRES INC.
$800,000
Rehabilitation of Chemin du Fleuve and Slope Stabilization at 1750, Chemin du FleuveInfrastructureCONSTRUCTION J.P. ROY INC.
$499,300.71
Slope Stabilization Work on Chemin des Frênes and Rue des RochesInfrastructureGestimaction inc.
$464,089.58
Slope Stabilization on Chemin de Nicolet-FallsInfrastructureEXCAVATIONS GAGNON ET FRÈRES INC.
$800,000
Road Rehabilitation of Chemins du Pérodeau and des Courbes in Lac-Saint-PaulInfrastructureCONSTRUCTION FGK INCORPORÉE
$2,425,260.32
Slope Stabilization on Route 105 in La PêcheInfrastructureConstruction FGK inc.
$971,562.59
Slope Stabilization Work on Chemin St-François in St-Coeur-de-Marie SectorInfrastructureLES EXCAVATIONS G. LAROUCHE INC.
$293,186.25
Slope Stabilization on Route 105 in La PêcheInfrastructureCONSTRUCTION FGK INCORPORÉE
$971,562.59
Slope Stabilization Work on McLinton and Mill RoadsInfrastructureCONSTRUCTION FGK INCORPORÉE
$190,078.14
Slope Stabilization Works Near Fréchette and Paillé StreetsInfrastructureFÉDÉRATION QUÉBÉCOISE DES MUNICIPALITÉS LOCALES ET RÉGIONALES (FQM)
$52,313.63
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far