Slope Stabilization Work in Shawinigan-Sud Sector
Ville de Shawinigan · Awarded contract
AwardedSlope Stabilization Work in Shawinigan-Sud Sector
Awarded 19 Oct 2020
Awarded19 Oct 2020
Value$92,543.96
SupplierAlide Bergeron et Fils Ltée
AgencyVille de Shawinigan
ProvinceQuebec
CategoryInfrastructure
Ended 5y 12mo ago1mo term
Awarded 19 Oct 2020Expired 25 Nov 2020
About
Ville de Shawinigan awarded a contract to Alide Bergeron et Fils Ltée for slope stabilization work in the Shawinigan-Sud sector, valued at CAD 92,543.96.
The project falls under the category of construction of infrastructure or civil engineering works.
Similar open tenders12
TenderCloses
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Repair of Structure P-08945 on Rue Saint-Henri over Boulevard Saint-Paul — SaguenayInfrastructure
07 Dec 2026
Rock Face Stabilisation on Chemin de la RivièreInfrastructure
24 Nov 2026
Prevention Works for Highly Retrogressive Landslides on Rivière à Veillet StreamInfrastructure
07 Dec 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Modifications and Maintenance of Domestic Sewer Infrastructure – Gentilly and Sainte-Angèle-de-LavalWater & Sanitation
03 Dec 2026
Rehabilitation of Water, Sewer and Road Infrastructure on Loisirs and Vachon StreetsInfrastructure
19 Nov 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Slope Stabilization Works in Shawinigan-Sud SectorInfrastructureAlide Bergeron et Fils Ltée
$105,049.79
Slope Stabilization Work in Shawinigan-Sud SectorInfrastructureALIDE BERGERON & FILS LTÉE
$147,327.45
Slope Stabilization Works in Saint-Coeur-de-Marie SectorInfrastructureFERNAND GILBERT LTÉE
$1,427,148.84
Engineering Design Services for Slope Stabilization at Two SitesConsultancy & LegalPLURITEC LTÉE
$36,430.65
Slope Stabilization Work in Secteur des BrumesInfrastructureALIDE BERGERON & FILS LTÉE
$443,013.62
Slope Stabilization Work on Chemin St-François in St-Coeur-de-Marie SectorInfrastructureLES EXCAVATIONS G. LAROUCHE INC.
$293,186.25
Slope Stabilization Work in Secteur des BrumesInfrastructureALIDE BERGERON & FILS LTÉE
$443,013.62
Engineering Design Services for Slope Stabilization at Two Sites in ShawiniganConsultancy & LegalPLURITEC LTÉE
$39,896.33
Slope Stabilization Work on Rue AlarieInfrastructureLES EXCAVATIONS G. LAROUCHE INC.
$33,059.08
Slope Stabilization Work at 184, rang Saint-AndréInfrastructureUnivert Paysagement Inc. - Division Excavation et Travaux Civils
$31,679.01
Slope Stabilization Works in Vallée Chaline, Saint-LazareInfrastructureLoiselle inc.
$12,155,412.97
Engineering Services for Slope Stabilization on Rue AlarieInfrastructureGroupe Géos
$29,606.06
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far