Sludge Removal by Drying of Ponds 3A and 3B in Ste-Marthe-du-Cap
Ville de Trois-Rivières · Awarded contract
AwardedSludge Removal by Drying of Ponds 3A and 3B in Ste-Marthe-du-Cap
Awarded Unknown
AwardedNot specified
Value$8,585,411.21
AgencyVille de Trois-Rivières
ProvinceQuebec
CategoryWater & Sanitation
About
Ville de Trois-Rivières awarded a contract to Les Consultants Mario Cossette Inc.
for the removal of sludge by drying ponds 3A and 3B in Ste-Marthe-du-Cap, under the sludge disposal category, valued at CAD 8,585,411.21.
Similar open tenders12
TenderCloses
Sludge Removal by Dewatering of Aerated Pond 1B – Sainte-Marthe-du-CapWater & Sanitation
10 Dec 2026
Sludge Emptying of Aerated Ponds — Saint-Étienne-des-GrèsWater & Sanitation
23 Nov 2026
Pond Sludge Removal (Vidange des boues des étangs)Water & Sanitation
07 Dec 2026
Sludge Emptying Services for StaRRE Water Recovery Stations in La Plaine and RAETMWater & Sanitation
15 Dec 2026
Transport, Treatment, Storage and Disposal of Dewatered Sludge for Wastewater Treatment PlantWater & Sanitation
25 Nov 2026
Emptying of Aerated Ponds — Transport and Disposal of SludgeWater & Sanitation
23 Nov 2026
Kamsack Lagoon Cell 2 Sludge Removal and Holding Cell Dewatering – 2027Water & Sanitation
19 Nov 2026
Vidange, transport, traitement et valorisation des eaux usées et boues de fosses septiquesWater & Sanitation
08 Dec 2026
Cleaning of Drainage Elements (manholes, catch basins, pipes, culverts) – Saint-Jean-sur-Richelieu (Montérégie)Water & Sanitation
10 Dec 2026
Construction and Removal of Clay Dike Closures for Flood Response – St. Jean Baptiste & Letellier, ManitobaInfrastructure
02 Dec 2026
Construction and Removal of Clay Dike Closures for Spring Flood Response — Morris and Aubigny, MBInfrastructure
01 Dec 2026
Design-Build Upgrade of Solid Treatment Stream at StaRRE La Pinière (Stage 1)Water & Sanitation
17 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Sludge Removal by Drying of Ponds 3A and 3B in Ste-Marthe-du-CapWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$7,078,333.2
Sludge Removal by Drying of Aerated Pond 1A in Ste-Marthe-du-Cap Sector, Trois-RivièresEnergy & EnvironmentLES CONSULTANTS MARIO COSSETTE INC.
$7,568,808.48
Sludge Removal from Aerated Ponds in Sainte-Marthe-du-CapWater & SanitationLes Consultants Mario Cossette inc.
$6,439,984.01
Sludge Removal by Drying at Aerated Pond in Saint-Louis-de-France Sector, Trois-RivièresWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$987,094.67
Sludge Removal by Drying at Aerated Pond in Saint-Louis-de-France Sector, Trois-RivièresWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$957,448.78
Sludge Removal by Drying of Aerated Ponds in St-Louis-de-France Sector, Trois-RivièresWater & SanitationEXCENT ENVIRONNEMENT INC.
$999,995.06
Sludge Removal from Aerated Pond #1 for Ville de Saint-PieWater & SanitationLes Consultants Mario Cossette inc.
$88,644.17
Sludge Removal from Wastewater Treatment Ponds for Ville de CausapscalWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$155,384.72
Sludge Removal from Wastewater Treatment Ponds for Ville de CausapscalWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$208,122
Sludge Removal from Aerated Ponds for Régie d'assainissement des CoteauxWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$1,966,682.68
Sludge Removal and Valorization from Aerated Ponds #2 and #4 in St-HermasWater & SanitationLes Consultants Mario Cossette inc.
$65,797.18
Sludge Removal and Disposal from Aerated Ponds 2 and 3 at Wastewater Treatment PlantWater & SanitationLES CONSULTANTS MARIO COSSETTE INC.
$257,087.5
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open water and sanitation tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far