Soil and Material Quality Control for Kelly Bridge Deck Construction

Awarded 11 Feb 2020

View live tenders
Awarded11 Feb 2020
Value$21,988.15
ProvinceQuebec
CategoryInfrastructure
Ended 4y 9mo ago2y term
Awarded 11 Feb 2020Expired 20 Feb 2022

Ministère des Transports (Direction de l'administration des appels d'offres publics) awarded a contract to Groupe ABS inc.

for soil and material quality control as part of the construction of a new deck for the Kelly Bridge, under a negotiated contract valued at CAD 21,988.15.

Similar open tenders12

Material Quality Control for Maintenance Works on Honoré‑Mercier Bridge Structures P-03226 & P-03228 — Montréal and KahnawakeInfrastructure
30 Nov 2026
Quality Control of Soils and Materials for Reconstruction of Autoroute 20 Ouest with Concrete Pavement — Chaudière-AppalachesInfrastructure
07 Dec 2026
Supply of Steel Profiles and Pre-assembled Decking for Two Temporary Bridge Decks – Direction générale de l'EstrieInfrastructure
07 Dec 2026
Quality and Materials Control Engineering Services — Underground Infrastructure Reconstruction, Saint-Sacrement & Sacré-CœurInfrastructure
20 Nov 2026
On-Demand Analyses of Construction Residual Materials for Road Works – Abitibi‑TémiscamingueEnergy & Environment
10 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Material Quality Control and Soil Traceability Services for 2027 – Two Optional Renewal YearsInfrastructure
23 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Supply and Delivery of Bridge Deck Joints, Waterproofing Membranes and Related Materials — Government of Saskatchewan (RFSQ Repost)Infrastructure
11 Aug 2031
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.