Soil, Material, and Environmental Characterization Study for Route 117 (Lac-Pythonga), Phase II
Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedSoil, Material, and Environmental Characterization Study for Route 117 (Lac-Pythonga), Phase II
Awarded 30 Oct 2019
Ended 3y 9mo ago3y 3mo term
Awarded 30 Oct 2019Expired 9 Feb 2023
About
The Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) awarded a contract to Services EXP inc., Les for a soil, material, and environmental characterization study, phase II, on Route 117 (Lac-Pythonga), under the on-demand contract execution program 8901-19-KZ01.
The contract, valued at CAD 49,611.31, falls under engineering services related to transport infrastructure.
Similar open tenders12
TenderCloses
On-Demand Environmental Services for Road Projects — Laurentides & LanaudièreEnergy & Environment
07 Jan 2027
Quality Control of Soils and Materials for Reconstruction of Autoroute 20 Ouest with Concrete Pavement — Chaudière-AppalachesInfrastructure
07 Dec 2026
On-Demand Analyses of Construction Residual Materials for Road Works – Abitibi‑TémiscamingueEnergy & Environment
10 Dec 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Repair of Structure P-12004 on Route 169 (Lac-Jacques-Cartier)Infrastructure
10 Dec 2026
Design and Tender Package for Grading and Surfacing of Highway No. 106 (Tyrrell Lake Access Rd to Hwy 167) — Saskatchewan Ministry of HighwaysInfrastructure
26 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Installation of New Safety Guardrails on Chemin du Lac Rapide, Lac‑Pythonga (Outaouais)Infrastructure
20 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
Environmental, Regulatory, Engineering and Design Support for Mackenzie Valley Highway ProjectInfrastructure
08 Dec 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





