Supply and Installation of Horizontal Landfill Gas Systems at City of Calgary Landfill Sites
Awarded 04 May 2026
About
City of Calgary awarded a contract to KBL Projects Ltd.
for the supply and installation of horizontal landfill gas systems at the East Calgary, Spyhill, and Shepard landfill sites, valued at CAD 2,913,128.87.
The work follows base pricing based on Calgary Horizontal LFG Collectors DBM_Rev 1 (January 23, 2026), which outlines the basis of design, a five-year conceptual sequencing and layout of horizontal collectors, and estimated total lengths at each site.
Change management may be required based on final designs developed for each site, and contractor flexibility is key to project success.
Tetra Tech is expected to submit final designs for each site to optimize LFG horizontal collection placement while accommodating installation and landfill operations constraints.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





