Supply of Doors and Lead-Lined Frames for Renovation Project at Collège Ahuntsic
Collège Ahuntsic · Awarded contract
AwardedSupply of Doors and Lead-Lined Frames for Renovation Project at Collège Ahuntsic
Awarded Unknown
AwardedNot specified
Value$61,800.00
SupplierGROUPE LMT INC.
AgencyCollège Ahuntsic
ProvinceQuebec
CategoryConstruction
Ended 3y 12mo ago
Award date unknownExpired 30 Nov 2022
About
Collège Ahuntsic awarded a contract to GROUPE LMT INC.
for the acquisition of doors and lead-lined frames for a renovation project, valued at CAD 61,800.
The contract was awarded through a non-competitive (sole-source) procurement process.
Similar open tenders12
TenderCloses
Doors, Frames and Hardware for Operating Room & Day Surgery Expansion – Hôpital Charles‑Le Moyne, LongueuilConstruction
04 Dec 2026
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
Installation of Doors, Frames and Hardware – Hôtel Casino MontréalConstruction
10 Dec 2026
Addition of Exit Doors to Cafeteria and Multipurpose Hall – École METConstruction
11 Dec 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Window Replacement — Campus ChamblyConstruction
25 Nov 2026
Replacement of Doors and Windows, Masonry Repair and Metalwork Restoration – 5955 rue Waverly, MontréalConstruction
26 Nov 2026
Upgrade of Beauharnois Town Hall – Building Renovation (Masonry, Carpentry, Doors & Windows, Metal Framing)Construction
02 Dec 2026
Architectural Services for Fit-Out of GMF-U at CLSC de l'Est‑de‑MontréalConstruction
15 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Supply of Doors, Frames, and Hardware for LaSalle Secondary School ExpansionConstructionGroupe LMT inc
$1,559,999
Supply of Doors and Frames to Cégep du Vieux-MontréalConstructionCADROPORTE MANUFACTURIER INC.
$29,530
Supply and Installation of Doors, Frames, and Hardware for Chambly Secondary School ExpansionConstructionGroupe L.M.T
$1,360,744.3
Supply and Installation of Doors, Frames, and Hardware for Hôpital Pierre-Le Gardeur Care Units ExpansionConstructionGROUPE LMT INC.
$7,963,721
Supply and Installation of Doors, Frames, and Hardware for Phase 2 of CHU de Québec-Université Laval Hospital ComplexConstructionGROUPE LMT INC.
$1,427,777
Supply and Installation of Doors, Frames, and Hardware for Laval Secondary School ExpansionConstructionAgences Robert Janvier ltée
$3,207,951.54
Supply and Installation of Doors, Frames, and Hardware for Lachine Hospital Expansion and RedevelopmentConstructionLES AGENCES ROBERT JANVIER LTÉE
$7,395,000
Supply and Installation of Doors, Frames, and Hardware for Hector-Fabre Building Redevelopment in QuébecConstructionGROUPE LMT INC.
$740,882.72
Supply of Doors and Frames to Cégep du Vieux-MontréalConstructionCADROPORTE MANUFACTURIER INC.
$29,280
Replacement of Doors, Frames, and Hardware at École ChavignyConstructionPLURITEC LTÉE
$38,300
Supply of Doors and Frames for Student Residence at CEGEP de La Gaspésie et des IlesConstructionRaymond Architectural Inc.
$47,475
Supply and Installation of Doors, Frames, and Hardware for Secondary School Expansion in MirabelConstructionGROUPE LMT INC.
$1,757,757
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





