Supply of Granite Curbs for 3rd Avenue Revitalization in Val-d'Or (Phase 4)
Ville de Val-d'Or · Awarded contract
AwardedSupply of Granite Curbs for 3rd Avenue Revitalization in Val-d'Or (Phase 4)
Awarded 20 Nov 2023
Awarded20 Nov 2023
Value$281,617.85
SupplierBORDURES POLYCOR INC.
AgencyVille de Val-d'Or
ProvinceQuebec
CategoryInfrastructure
Ended 1y 12mo ago1y term
Awarded 20 Nov 2023Expired 20 Nov 2024
About
Ville de Val-d'Or awarded a contract to Bordures Polycor Inc.
for the supply of granite curbs for the revitalization of 3rd Avenue between 6th Street and 7th Street in Val-d'Or (Phase 4), valued at CAD 281,617.85.
Similar open tenders12
TenderCloses
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Paving and Roadway Resurfacing Works on Boulevard BrassardInfrastructure
30 Nov 2026
Supply and Install Guardrail, Paved Gutters and Rock Armoring — Cape Breton Highway, Cape Breton Highlands National ParkInfrastructure
24 Nov 2026
Decontamination, Granular Replenishment and Paving of Rue des Bosquets and Rue des ÉrablesInfrastructure
30 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Redevelopment of Ernest-Anctil, des Pyrénées and des Équinoxes Streets — Bois-FrancInfrastructure
25 Nov 2026
Mowing and Vegetation Cutting Along Highway 20 – Centre de services d'Ormstown (Montérégie)Infrastructure
10 Dec 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Addition of Video Appearance Capability and Central Control Refurbishment – 7600 Boulevard Parent Nord, Trois-Rivières QCConstruction
10 Dec 2026
Renewal of Grand Boulevard Infrastructure — Paving and Civil Engineering WorksInfrastructure
11 Jan 2027
Mowing and Cutting of Autoroute 35 Verges — South Sector, Saint-Jean-sur-Richelieu (Montérégie)Infrastructure
07 Dec 2026
Major Rehabilitation of Boulevard Guimond Infrastructure — Roads, Water Pipes, Cables, and Road MarkingsInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





