Supply of Stainless Steel Components for Pierre-Laporte Bridge
MTQ - Direction de la qualification des produits, de l'approvisionnement et des opérations contractuelles centralisées · Awarded contract
AwardedSupply of Stainless Steel Components for Pierre-Laporte Bridge
Awarded 15 Oct 2018
Ended 7y 11mo ago3mo term
Awarded 15 Oct 2018Expired 8 Jan 2019
About
MTQ - Direction de la qualification des produits, de l'approvisionnement et des opérations contractuelles centralisées awarded a contract to PRO-MÉTAL PLUS INC.
for the acquisition of stainless steel parts for the Pierre-Laporte Bridge in the Chaudière-Appalaches region, valued at CAD 18,223.75.
Similar open tenders12
TenderCloses
Material Quality Control for Maintenance Works on Honoré‑Mercier Bridge Structures P-03226 & P-03228 — Montréal and KahnawakeInfrastructure
30 Nov 2026
Supply of Steel Profiles and Pre-assembled Decking for Two Temporary Bridge Decks – Direction générale de l'EstrieInfrastructure
07 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Supply and Fabrication of Steel Vehicle Ramps and Trestles for DFO and National Defence – Deliveries to Steveston, French Creek and Port EdwardManufacturing & Industrial
19 Nov 2026
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractInfrastructure
10 Dec 2026
Fabrication of Hot-Dip Galvanized Stilling Well Platform for Pointe-des-Cascades Hydrometric Station, Saint Lawrence River (Québec)Infrastructure
27 Nov 2026
IMQ – Réfection du pont roulant (Bâtiments)Manufacturing & Industrial
20 Nov 2026
Replacement of Steel Protective Coating on Pont de la ConcordeInfrastructure
15 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Replacement of Culverts 121690 and 159305 Using Trenchless Technique on A-15 at Prévost (Laurentides)Infrastructure
26 Nov 2026
Supply and Installation of One Stainless Steel Rigid Cover for 9 m3 Sand Spreader – QuébecTransport & Logistics
14 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





