Traffic Study 116/A30 for Ville de Saint-Bruno-de-Montarville
Ville de Saint-Bruno-de-Montarville · Awarded contract
AwardedTraffic Study 116/A30 for Ville de Saint-Bruno-de-Montarville
Awarded 04 Apr 2023
Ended 2y 7mo ago1y term
Awarded 4 Apr 2023Expired 10 Apr 2024
About
Ville de Saint-Bruno-de-Montarville awarded a contract to FNX-INNOV INC.
for a traffic study (Étude de circulation 116/A30) in the traffic engineering category.
The contract was awarded through a non-competitive (gré à gré) process, with a value of CAD 37,470.35.
Similar open tenders12
TenderCloses
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Traffic Study for Downtown Sector — Professional Engineering ServicesInfrastructure
30 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Replacement of Culvert 130-02A on Rue Sainte-Hélène – Municipality of Saint-SamuelInfrastructure
30 Nov 2026
Municipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BInfrastructure
26 Nov 2026
On-Demand Contract for Short-Duration Work Zone Signage – Bas-Sainte-Laurent-Gaspésie--Îles-de-la-MadeleineInfrastructure
19 Nov 2026
Upgrade of Pedestrian Crossings and FRCR Installation on Route 229 opposite INRS, VarennesInfrastructure
25 Nov 2026
Conversion of Road Lighting on Autoroute 440 between A‑19/A‑440 and A‑25/A‑440, LavalInfrastructure
27 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Traffic Study 116/A30 for Ville de Saint-Bruno-de-MontarvilleConsultancy & LegalFNX-INNOV INC.
$37,470.35
Traffic Study at Intersections with Crossing Guards for Ville de Saint-Bruno-de-MontarvilleConsultancy & LegalFNX-INNOV inc.
$41,391
Traffic Study for Development Projects in Mont-Saint-HilaireConsultancy & LegalFNX-INNOV INC.
$49,439.25
Feasibility Study for New Intersection on Route 116InfrastructureFNX-INNOV INC.
$155,216.25
Traffic Circulation Study at Promenades IntersectionConsultancy & LegalLES SERVICES EXP INC.
$45,760.05
Professional Traffic Study Services for 17 Intersections in ShawiniganConsultancy & LegalFNX-INNOV INC.
$75,343.12
Traffic Study for Safety Improvements Around Polyvalente des MontsConsultancy & LegalFNX-INNOV inc.
$32,440.2
Professional Traffic Study Services for 17 Intersections in ShawiniganConsultancy & LegalFNX-INNOV INC.
$67,834.51
Engineering Services for New Roadway Development in Saint-Bruno-de-MontarvilleInfrastructureShellex Groupe Conseil inc.
$49,640.47
Engineering Services for New Roadway Development in Saint-Bruno-de-MontarvilleInfrastructureShellex Groupe Conseil inc.
$66,455.55
Traffic Study for Safety Improvements Around Fleur-des-Neiges SchoolConsultancy & LegalFNX-INNOV INC.
$35,900
Engineering Services for Downtown Traffic Study in Saint-HyacintheConsultancy & LegalFNX-INNOV INC.
$53,463.38
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





