Underground Network Extension and Overhead Network Relocation by Vidéotron for Ville de Laval
Ville de Laval · Awarded contract
AwardedUnderground Network Extension and Overhead Network Relocation by Vidéotron for Ville de Laval
Awarded Unknown
AwardedNot specified
Value$294,165.45
SupplierVIDÉOTRON LTÉE
AgencyVille de Laval
ProvinceQuebec
CategoryInfrastructure
About
Ville de Laval awarded a contract to Vidéotron Ltée for major works involving the extension of the underground network and relocation of the overhead network, under a negotiated contract, valued at CAD 294,165.45.
Similar open tenders12
TenderCloses
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
On-Demand Televised Inspection of Sewer Pipes and Manholes – City of LavalWater & Sanitation
26 Nov 2026
Construction of Sectorisation Chambers on the City of Laval Water NetworkWater & Sanitation
26 Nov 2026
Modifications and Additions to Municipal Underground Conduit Network on Avenue Beaumont (Wiseman to d’Outremont)Infrastructure
01 Dec 2026
Addition of Video Appearance Capability and Central Control Refurbishment – 7600 Boulevard Parent Nord, Trois-Rivières QCConstruction
10 Dec 2026
Electromechanical Works for Redevelopment of Laval Police Training Centre – Valérie Gignac Building, 3225 Boulevard Saint-Martin EstConstruction
26 Nov 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Rehabilitation of Water, Sewer and Road Infrastructure on Loisirs and Vachon StreetsInfrastructure
19 Nov 2026
Montréal — Poste Des Sources (315/25 kV): Travaux de pérennité et mise à niveauEnergy & Environment
18 Dec 2026
Camera Upgrade General Works – 500 Rue de la Faune, Québec (G1G 0G9)Public Safety & Security
26 Nov 2026
2027 Underground Infrastructure Reconstruction on Canterbury, Parkway and Nicole — Watermain, Sewer, Sidewalks, Paving and Street LightingWater & Sanitation
03 Dec 2026
Separation of Networks on Rue Monseigneur-Prévost (Saint-Marc to Saint-Laurent) — Sewer ConstructionWater & Sanitation
14 Jan 2027
Other similar contracts12
Contract and supplierAwarded value
Underground Network Extension and Overhead Network Relocation by Hydro-Québec for Ville de LavalInfrastructureHYDRO QUEBEC
$15,864,854.22
Relocation of Overhead Telecommunications Network on Boulevard des Mille-Îles by VidéotronTelecommunicationsVIDÉOTRON LTÉE
$23,553.56
Relocation of Overhead Public Utility Network in LavalInfrastructureVIDÉOTRON S.E.N.C.
$8,611.91
Relocation of Overhead Telecommunications Network on Boulevard des Mille-Îles, LavalTelecommunicationsVIDÉOTRON LTÉE
$57,568.3
Undergrounding of Existing Cable Distribution Networks for Rue St-Omer ExtensionInfrastructureVidéotron Ltée
$119,774.7
Relocation of Public Utilities by Vidéotron for Ville de LavalInfrastructureVIDÉOTRON LTÉE
$21,880.55
Engineering Mandate for Underground Cabling Networks in LavalTelecommunicationsVIDEOTRON S E N C
$451,434.31
Relocation of Public Utilities by Vidéotron for Ville de LavalInfrastructureVIDÉOTRON S.E.N.C.
$66,812.11
Redesign of Overhead Distribution and Telecommunication Network for Val-Martin Buildings – Phase 1TelecommunicationsVIDÉOTRON S.E.N.C.
$35,384.18
Undergrounding of Vidéotron Cabling for Le Triangle Project in MontréalTelecommunicationsVidéotron s.e.n.c.
$232,687.03
Dismantling and Relocation of Overhead Utility Network on Avenue Léo-Lacombe for Concorde Metro ProjectInfrastructureVIDÉOTRON LTÉE
$58,722.63
Underground Network Extension and Aerial Network Relocation on Robert-Bourassa Blvd and des Aristocrates AveTelecommunicationsLA COMPAGNIE DE TÉLÉPHONE BELL DU CANADA OU BELL CANADA
$1,141,144.85
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far