Ventilation Phase 2, Door Replacement, and Roof Refection at Commission Scolaire English-Montreal
Commission Scolaire English-Montreal · Awarded contract
AwardedVentilation Phase 2, Door Replacement, and Roof Refection at Commission Scolaire English-Montreal
Awarded Unknown
AwardedNot specified
Value$94,310.80
SupplierScience du bâtiment Alta
ProvinceQuebec
CategoryConstruction
About
Commission Scolaire English-Montreal awarded a contract to Science du bâtiment Alta for ventilation phase 2, door replacement, roof refection, and other related work.
The contract, valued at CAD 94,310.8, was awarded through a non-competitive (gré à gré) process under project management categories.
Similar open tenders12
TenderCloses
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardConstruction
01 Dec 2026
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Construction
19 Nov 2026
Mechanical & Electrical Engineering Services for Building Envelope Renovation and Addition of Mechanical Ventilation – École primaire Léon‑Guilbault, Building 1Construction
09 Dec 2026
Independent Commissioning Authority Services – Modernization & Addition of 10 to 12 School of Vista Heights and Ecole De La Rose Sauvage, CalgaryConsultancy & Legal
14 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Installation and Commissioning of HVAC System at École Victor Doré - Phase 2Construction
23 Nov 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Replacement of Flat Roof Covering (Phase 2) – École Ami-Joie (086)Construction
03 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





