Window Replacement and Sanitary Block Renovation at École Saints-Anges
Centre de services scolaire de la Beauce-Etchemin · Awarded contract
AwardedWindow Replacement and Sanitary Block Renovation at École Saints-Anges
Awarded 24 Feb 2020
Awarded24 Feb 2020
Value$1,330,275.20
SupplierExperts Constructions MG Inc
ProvinceQuebec
CategoryConstruction
Ended 5y 11mo ago10mo term
Awarded 24 Feb 2020Expired 17 Dec 2020
About
Centre de services scolaire de la Beauce-Etchemin awarded a contract to Experts Constructions MG Inc for the replacement of windows and renovation of sanitary blocks at École Saints-Anges (2019-20), under the building construction, repair, and maintenance services category, valued at CAD 1,330,275.20.
Similar open tenders12
TenderCloses
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresConstruction
14 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Refurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestConstruction
10 Dec 2026
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
Rénovation intérieure (Phase 1) — École Beau-SoleilConstruction
24 Nov 2026
Window Replacement — Campus ChamblyConstruction
25 Nov 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Heating System Refurbishment – École St-Joseph d'AmosConstruction
03 Dec 2026
Interior Reconfiguration, Cladding and Window Repairs — Centre Éducation des Adultes des Patriotes (CEAP) Marie-VictorinConstruction
01 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Gymnasium Roof Rehabilitation at École De Léry, BeaucevilleConstruction
01 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Window Replacement and Sanitary Block Renovation at École Saints-AngesConstructionExperts Constructions MG Inc
$1,330,275.2
Window Replacement, Sanitary Block Renovation, and Flooring Replacement at École Secondaire VeilleuxConstructionExperts Constructions MG Inc
$1,395,030.21
Window Replacement, Sanitary Block Renovation, and Flooring Replacement at École Secondaire VeilleuxConstructionExperts Constructions MG Inc
$1,395,030.21
Window Replacement and Sanitary Block Renovation at École des SommetsConstructionCONSTRUCTION CAMAX INC.
$2,522,785.23
Window Replacement and Sanitary Block Renovation at École des SommetsConstructionCONSTRUCTION CAMAX INC.
$2,522,785.23
Window and Door Replacement, Roof and Washroom Renovation, and Classroom and Kitchen Refurbishment at Saint-Narcisse (2017-18)ConstructionEXPERTS CONSTRUCTIONS MG INC.
$1,139,040.59
Window Replacement and Sanitary Block Renovation at Château-D'Eau SchoolConstructionCONSTRUCTION FINITION INC.
$412,017.86
Renovation of Windows and Replacement of Sanitary Blocks at Centre de services scolaire des ChênesConstructionEXP service inc
$67,905.77
Architectural Services for Window Replacement and Sanitary Block Renovation at École Sainte-Mary-MagdalenConstructionLECLERC ARCHITECTES INC.
$70,932.1
Replacement of Windows and Sanitary Blocks at Centre de services scolaire de la Beauce-EtcheminConstructionKAÏVO ARCHITECTE INC.
$70,829.38
Architectural Services for Window Replacement and Sanitary Block Renovation at École Sainte-Mary-MagdalenConstructionLECLERC ARCHITECTES INC.
$70,932.1
Window and Roof Replacement, Sanitary Block and Parking Refection at École HarmonieConstructionÉQIP SOLUTIONS EXPERTS-CONSEILS INC.
$48,150
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





