9368-6616 Québec inc.
Supplier · Construction
9368-6616 Québec inc.
Won in the last 12 months$33M13 contractsValue won per quarter, last three years
Contracts on record13$33M in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerCommission Scolaire English-Montreal30% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Renovation of Sanitary Blocks, Concierge Offices, and Office Reconfiguration for Centre de services scolaire de LavalConstruction$2MRoof Replacement at École La DauversièreConstruction$1.4MInterior Finishing Replacement for Sanitary Blocks at École Sainte-ColetteConstruction$815KHVAC System Upgrades at École Secondaire du Harfang (St-François Pavilion)Construction$2.1MRefection of Architectural and Mechanical Systems at Cégep Marie-Victorin (Summer 2022)Construction$2MRenovation of Kitchens and Bathrooms in MSA Housing PavilionsConstruction$4.1MSlab Repair and Asset Maintenance at Cedarcrest Elementary SchoolConstruction$5MSlab Repair and Asset Maintenance at Cedarcrest Elementary SchoolConstruction$5M25/04/2023Renovation of Kitchens and Bathrooms in MSA Housing PavilionsConstruction$4.1M25/08/2022HVAC System Upgrades at École Secondaire du Harfang (Pavillon St-François)Construction$2.1M04/05/2022
Who they win it from
Their biggest government buyers and how much of their work each one is.
Commission Scolaire English-Montreal is their biggest buyer at 30% of value, across 5 buyers shown.
Cégep Marie-Victorin$4.3M13%
Other buyers$2.0M6%
About them
Company details, where they work and the names they trade under.
Also traded as9368-6616 Québec inc.
Open tenders that match their work
Refurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Closes 19 NovConstructionAddition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieCloses 8 DecConstructionVentilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardCloses 1 DecConstructionReplacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesCloses 9 DecConstructionRefurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestCloses 10 DecConstructionArchitectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardCloses 9 DecConstructionWindow Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresCloses 14 DecConstructionMechanical Room Renovation – École Notre-Dame-du-bon-ConseilCloses 26 NovConstructionRefurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Closes 30 NovConstructionRénovation intérieure (Phase 1) — École Beau-SoleilCloses 24 NovConstructionBuilding Repairs and Maintenance at Barthélemy-Joliette Secondary SchoolCloses 23 NovConstructionMechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineCloses 15 DecConstruction
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





