AG Conseil
Supplier · Infrastructure
AG Conseil
Won in the last 12 months$310K6 contractsValue won per quarter, last three years
Contracts on record6$310K in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerMinistère des Ressources naturelles et des Forêts72% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Inspection and Load Capacity Assessment of 22 Steel-Wood Forest Bridges in Saguenay–Lac-Saint-JeanInfrastructure$16KInspection and Load Capacity Assessment of 25 Steel-Wood Forest Bridges in Capitale-Nationale – Chaudière-AppalachesInfrastructure$20KInspection and Load Capacity Assessment of 47 Steel-Wood Forest Bridges in Saguenay–Lac-Saint-Jean, Mauricie, and Côte-NordInfrastructure$51KInspection and Load Capacity Assessment of 48 Steel-Wood Forest Bridges in QuebecInfrastructure$70KInspection and Load Capacity Assessment of Steel-Wood Bridges in Forest EnvironmentsInfrastructure$86K07/08/2025Inspection and Load Capacity Assessment of 48 Steel-Wood Forest Bridges in QuebecInfrastructure$68K24/07/2023
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Ministère des Ressources naturelles et des Forêts, 72% of value.
About them
Company details, where they work and the names they trade under.
Also traded asAG Conseil
Open tenders that match their work
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheCloses 19 NovInfrastructureReconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesCloses 9 DecInfrastructureMaterial Quality Control for Maintenance Works on Honoré‑Mercier Bridge Structures P-03226 & P-03228 — Montréal and KahnawakeCloses 30 NovInfrastructureReconstruction of A-20 West in Concrete — Complex Bridge and Tunnel Construction & Repair (Chaudière-Appalaches)Closes 7 DecInfrastructureLaboratory Refurbishment and Accessibility Upgrades – Laurentian Forestry Centre, Quebec CityCloses 2 DecConstructionSupply of Steel Profiles and Pre-assembled Decking for Two Temporary Bridge Decks – Direction générale de l'EstrieCloses 7 DecInfrastructureReconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractCloses 27 NovInfrastructureMajor Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Closes 24 NovInfrastructureMechanized Timber Harvesting and Winter Forest Road Construction – Larivière SectorCloses 26 NovAgriculture & FarmingReconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractCloses 10 DecInfrastructureConstruction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Closes 23 NovInfrastructureOn-Demand Analyses of Construction Residual Materials for Road Works – Abitibi‑TémiscamingueCloses 10 DecEnergy & Environment
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





