COENTREPRISE TRANSELEC-ARNO
Supplier · Energy & Environment, Infrastructure
COENTREPRISE TRANSELEC-ARNO
Won in the last 12 months$168M9 contractsValue won per quarter, last three years
Contracts on record9$168M in total
Running now0Latest win Nov 2026
Next contract endingSept 2027$30M · Hydro-Québec
Biggest buyerHydro-Québec100% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Emergency Labor Supply for Pole Installation and Assembler Workforce – Wave 2 by Hydro-QuébecEnergy & Environment$028/11/2025Replacement of 735 kV Power Transformers and Associated Civil Works at La Grande-2 Substation, Nord-du-QuébecEnergy & Environment$30.5M19/03/2025Construction, Maintenance, and Modification of Overhead Distribution Networks for Hydro-QuébecInfrastructure$60.6M30/11/2022Dismantling of Circuits 671 and 672 Connecting Grand-Mère and Turcotte Substations to Bourdais Substation in MauricieEnergy & Environment$3.4M17/11/2021Construction of 735 kV Micoua-Saguenay Transmission Line Section D (7 and 8) in Saguenay–Lac-Saint-JeanEnergy & Environment$56.6M15/06/2021Replacement of 315 kV Insulators Across Multiple Regions for Hydro-QuébecEnergy & Environment$2.6M05/03/2021Replacement of 315 kV Insulators Across Multiple Regions for Hydro-QuébecEnergy & Environment$1.5M05/03/2021Replacement of Insulators on Hydro-Québec Transmission Circuits in Capitale-Nationale and Côte-NordInfrastructure$3.1M22/05/2020Construction, Maintenance, and Modification of Overhead Distribution Networks in Multiple Québec RegionsEnergy & Environment$9.8M06/05/2019
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Hydro-Québec, 100% of value.
Hydro-Québec$168M100%
Coming up
Contracts that end soon and may go back out to tender.
Contracts ending in the next three years1 contract · $30M
The next one ends September 2027 at Hydro-Québec.
Recompete radar
1 expiring in 12moContracts nearing the end of their term. Some may go back out to tender when they expire.
About them
Company details, where they work and the names they trade under.
Also traded asCOENTREPRISE TRANSELEC - ARNO, COENTREPRISE TRANSELEC-ARNO
Open tenders that match their work
Montréal — Poste Des Sources (315/25 kV): Travaux de pérennité et mise à niveauCloses 18 DecEnergy & EnvironmentECI Construction of New 315-25 kV Substations Toupin and SoulignyCloses 21 JanInfrastructureConstruction of New 230 kV Sectioning Substation — Poste Pierre-Laporte, MontérégieCloses 20 JanEnergy & EnvironmentCivil and Electrical Works on Power Transformers and Shunt Inductances — Poste Némiscau, Nord-du-QuébecCloses 4 DecInfrastructureReplacement of Generator at Centre récréatif Édouard-RivetCloses 1 DecEnergy & EnvironmentEntretien et réparation des systèmes électriques basse et moyenne tension pour sites MTMD – région métropolitaine de MontréalCloses 10 DecInfrastructureReplacement of Transformer T4 and Associated Works at Poste Micoua, Côte‑NordCloses 11 DecInfrastructureRoad Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Closes 7 JanInfrastructureMise à niveau des équipements électriques — Sous‑station Est et Ouest, station d’épuration Jean‑R. MarcotteCloses 8 DecWater & SanitationIntegration of Renewable Energy Systems at Centrale de Quaqtaq (Nord-du-Québec) – Lot 2Closes 19 NovEnergy & EnvironmentConstruction of up to 97 km 230 kV Transmission Line from Dorsey Convertor Station to Wash’ake Mayzoon Station — ManitobaCloses 15 DecInfrastructureRenewal of Water Main Under the Rimouski River (TECQ)Closes 25 NovWater & Sanitation
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





