Consortium SNC-Lavalin-Cima
Supplier · Infrastructure, Consultancy & Legal
Consortium SNC-Lavalin-Cima
Won in the last 12 months$27M6 contractsValue won per quarter, last three years
Contracts on record6$27M in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerMinistère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics)61% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Engineering Services for Québec Bridge Deck Replacement – Design and Preliminary StudiesInfrastructure$3.8MEngineering Services for Replacement of Québec Bridge DeckInfrastructure$7M02/12/2020Engineering Services for Updating Preliminary Design and Preparing Plans and Specifications for Interchange 305 Redevelopment in LévisInfrastructure$2.7M27/11/2015Engineering Design and Specifications for a Bridge over the Jacques-Cartier River in ShannonInfrastructure$1.1M04/06/2014Surveillance des travaux de remplacement du ponceau P-14170FL et de construction d'un marais intertidalConsultancy & Legal$2.4M24/09/2010Preparation of Plans and Specifications for Preparatory Works for Turcot Complex Reconstruction in Montreal Metropolitan AreaInfrastructure$10M14/05/2009
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics), 61% of value.
Coming up
Contracts that end soon and may go back out to tender.
About them
Company details, where they work and the names they trade under.
Also traded asConsortium SNC-Lavalin-Cima, Consortium SNC-Lavalin - CIMA, Consortium SNC-Lavalin / CIMA, Consortium SNC-Lavalin / CIMA+, Consortium SNC-Lavalin/CIMA+
Open tenders that match their work
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractCloses 10 DecInfrastructureRoad Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Closes 7 JanInfrastructureReconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractCloses 27 NovInfrastructureEngineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheCloses 19 NovInfrastructurePreliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneCloses 7 DecInfrastructureReconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesCloses 9 DecInfrastructureMajor Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Closes 24 NovInfrastructureRepair of Structure P-12004 on Route 169 (Lac-Jacques-Cartier)Closes 10 DecInfrastructureReconstruction of A-20 West in Concrete — Complex Bridge and Tunnel Construction & Repair (Chaudière-Appalaches)Closes 7 DecInfrastructureConstruction of Bridge P-20696 on Rang Saint-Jérôme over Rivière Rémy, Baie-Saint-PaulCloses 4 DecInfrastructureRedevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieCloses 19 NovInfrastructureMunicipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BCloses 26 NovInfrastructure
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





