Construction BLG
Supplier · Construction
Construction BLG
Won in the last 12 months$4.2M9 contractsValue won per quarter, last three years
Contracts on record9$4.2M in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerCentre de services scolaire de la Pointe-de-l'Île98% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Interior Finishing Replacement at École Général-Vanier, Phase 1Construction$973KInterior Finishing Replacement at École secondaire Jean-GrouConstruction$546KInterior Finishing Replacement at École Général-Vanier, Phase 1Construction$1.1M12/04/2021Interior Finishing Replacement at École Secondaire Jean-GrouConstruction$546K07/04/2021Replacement of Exterior Doors and Vestibules at École Général-VanierConstruction$179K15/12/2020Water Damage Repair at École secondaire Pointe-aux-TremblesConstruction$25K19/10/2020Window Replacement at École de la Belle-Rive – Pavillon de la PointeConstruction$164K23/03/2020Interior Finishing Replacement at École Secondaire Pointe-aux-TremblesConstruction$624K23/05/2019Café-in Redevelopment at CÉGEP André LaurendeauConstruction$69K19/10/2009
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Centre de services scolaire de la Pointe-de-l'Île, 98% of value.
About them
Company details, where they work and the names they trade under.
Also traded asConstruction BLG
Open tenders that match their work
Replacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesCloses 9 DecConstructionRénovation intérieure (Phase 1) — École Beau-SoleilCloses 24 NovConstructionÉcole du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksCloses 24 NovConstructionArchitectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardCloses 9 DecConstructionReplacement of Windows and Doors – École primaire J.P. LabarreCloses 25 NovConstructionRefurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Closes 19 NovConstructionGymnasium Roof Rehabilitation at École De Léry, BeaucevilleCloses 1 DecConstructionRefurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestCloses 10 DecConstructionRefurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Closes 30 NovConstructionRenovation of Daycare, Exit, Various Rooms and Gymnasium – École primaire Guy-DrummondCloses 27 NovConstructionWindow Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresCloses 14 DecConstructionWindow Replacement at École Pie‑X‑de‑l'AssomptionCloses 7 DecConstruction
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





