Construction Momentum inc.
Supplier · Construction, Water & Sanitation, Infrastructure
Construction Momentum inc.
Won in the last 12 months$7.7M18 contractsValue won per quarter, last three years
Contracts on record18$7.7M in total
Running now0Latest win Nov 2026
Next contract endingMar 2027$590K · OMH de Montréal (OMHM)
Biggest buyerCentre de services scolaire Marguerite-Bourgeoys36% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Refection and Maintenance of Cladding and Guardrails for Buildings B and CConstruction$2.2MMasonry Work for Rehabilitation of Blocked Urinals at École Saint-HenriConstruction$44KStaircase Restoration (Escaliers #4) at Cégep de Saint-JérômeConstruction$130KExterior Envelope Renovation of Block C at École Secondaire Pierre-LaporteConstruction$313KMasonry Repair, Caulking, Balcony Replacement, and Painting at Résidence Alfredo-GagliardiConstruction$230KExterior Envelope Renovation at École Enfant-SoleilConstruction$564KFaçade Repair Work at the Civic Centre in Dollard-des-OrmeauxConstruction$321KRehabilitation of Sludge Storage Basin at Montreal Wastewater Treatment PlantWater & Sanitation$51KExterior Envelope Renovation at École Philippe-MorinConstruction$666KRéfection ponctuelle des façades aux habitations Benny FarmConstruction$589K19/08/2026
Who they win it from
Their biggest government buyers and how much of their work each one is.
Centre de services scolaire Marguerite-Bourgeoys is their biggest buyer at 36% of value, across 5 buyers shown.
Ville de Montréal$330K4%
Other buyers$1.1M14%
Coming up
Contracts that end soon and may go back out to tender.
Contracts ending in the next three years1 contract · $590K
The next one ends March 2027 at OMH de Montréal (OMHM).
Recompete radar
1 expiring in 12moContracts nearing the end of their term. Some may go back out to tender when they expire.
About them
Company details, where they work and the names they trade under.
Also traded asConstruction Momentum inc., CONSTRUCTION MOMENTUM INC.
Open tenders that match their work
General Building Envelope Repairs — 1666–1680 Rue de Chambly, MontréalCloses 19 NovConstructionRefurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestCloses 10 DecConstructionRefurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Closes 30 NovConstructionÉcole du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksCloses 24 NovConstructionArchitectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardCloses 9 DecConstructionAddition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieCloses 8 DecConstructionExterior Envelope Refurbishment and Related Works at École du Soleil‑Levant, LatulipeCloses 26 NovConstructionMechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineCloses 15 DecConstructionRefurbishment of Seating Tiers at Maison de la culture de Pointe-aux-Trembles, 14001 Rue Notre-Dame Est, MontréalCloses 16 DecConstructionGeneral Building Envelope Repairs – 3408–3422 rue Adam, MontréalCloses 24 NovConstructionMajor Renovation of Building at 20 Boulevard Comeau, Baie-Comeau (Québec) G4Z 3A8Closes 26 NovConstructionRestoration of Apartments 1 & 2 After Sinistre — 1216 Boulevard Henri‑Bourassa Est, MontréalCloses 25 NovConstruction
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





