L'Avant-Garde Construction
Supplier · Construction, Health & Medical
L'Avant-Garde Construction
Won in the last 12 months$10.0M31 contractsValue won per quarter, last three years
Contracts on record31$10.0M in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerCentre de services scolaire des Monts et Marées64% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Replacement of East and West Facade Windows at École Bon-Pasteur in Grande-RivièreConstruction$289KInstallation of Drainage Network Under Concrete Slab at 124 Route 132, PercéConstruction$476KWindow Replacement and Entrance 8 and Washroom Renovation at École St-RosaireConstruction$480KFlooring and Exterior Lighting Renovation at Lac-au-SaumonConstruction$275KRoof Renovation, Boiler Replacement, and Air Exchanger Installation at École Saint-DamaseConstruction$188KFoundation Waterproofing and Crawlspace Improvements at École Saint-VianneyConstruction$249KFoundation Waterproofing and Crawlspace Improvements at École Saint-VianneyConstruction$249K30/08/2021Roof Renovation, Boiler Replacement, and Air Exchanger Installation at École Saint-DamaseConstruction$188K07/07/2021Flooring and Exterior Lighting Renovation at Lac-au-SaumonConstruction$275K28/06/2021Ventilation Addition in Crawl Space at École Émile-DubéConstruction$75K16/06/2021
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Centre de services scolaire des Monts et Marées, 64% of value.
Other buyers$270K3%
About them
Company details, where they work and the names they trade under.
Also traded asL'Avant-Garde Construction
Open tenders that match their work
Ventilation Compliance Upgrade — École de l'Harmonie, Saint-EdouardCloses 1 DecConstructionAddition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieCloses 8 DecConstructionAir Conditioning and Ventilation Modifications at Jean-Bouchard Amphitheatre, Saint‑JanvierCloses 26 NovConstructionRefurbishment of Heating and Ground-Floor Interior Finishes – École secondaire Forimont (Phase 2)Closes 19 NovConstructionRéaménagement de la salle D-217 et installation d'une hotte – École secondaire des Grandes-MaréesCloses 9 DecConstructionArchitectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardCloses 9 DecConstructionParc national de la Gaspésie – Roof Refurbishment and Rooftop Air Conditioning Unit Replacement at Centre de découverte et de servicesCloses 3 DecConstructionMechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineCloses 15 DecConstructionRefurbishment and Reconfiguration of Marie-Guyart Building Spaces — 675 Boulevard René-Lévesque Est, Québec (G1R 6C8)Closes 30 NovConstructionRefurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestCloses 10 DecConstructionHeating System Refurbishment – École St-Joseph d'AmosCloses 3 DecConstructionElectromechanical Works for Redevelopment of Laval Police Training Centre – Valérie Gignac Building, 3225 Boulevard Saint-Martin EstCloses 26 NovConstruction
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





