Les Entreprises JSDR Inc.
Supplier · Construction
Les Entreprises JSDR Inc.
Won in the last 12 months$1.1M24 contractsValue won per quarter, last three years
Contracts on record24$1.1M in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerCentre de services scolaire de Montréal / BDA50% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Contract history
Caulking of Windows and Transom Panels for North and South FacadesConstruction$89KGeneral Caulking Work at École Bedford by Les Entreprises JSDRConstruction$40KCaulking Replacement at Mirabel Sector by Les Entreprises JSDR Inc.Construction$17KCaulking Replacement at Mirabel Sector by Les Entreprises JSDRConstruction$19KCaulking Replacement at Three East Sector SchoolsConstruction$33KCaulking Replacement at Mirabel Sector by Les Entreprises JSDRConstruction$12KCaulking Replacement at Centre multiservice de Sainte-ThérèseConstruction$16KCaulking Replacement at Three East Sector SchoolsConstruction$17KCaulking Replacement at Two Schools in Sainte-Thérèse SectorConstruction$32KWindow Caulking Refection at Emergency Shafts and Targeted Areas in Block AConstruction$59K
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Centre de services scolaire de Montréal / BDA, 50% of value.
About them
Company details, where they work and the names they trade under.
Also traded asLes Entreprises JSDR Inc.
Open tenders that match their work
Window Replacement — École primaire Sainte-Marie, Saint-Marc des CarrièresCloses 14 DecConstructionReplacement of Windows and Doors – École primaire J.P. LabarreCloses 25 NovConstructionCrack Sealing on Multiple Roads in the Centre de services de JolietteCloses 30 NovInfrastructureÉcole du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksCloses 24 NovConstructionWindow Replacement at École Pie‑X‑de‑l'AssomptionCloses 7 DecConstructionBuilding Repairs and Maintenance at Barthélemy-Joliette Secondary SchoolCloses 23 NovConstructionRefurbishment of Canopy, Masonry and Windows – École primaire Ste-Geneviève-OuestCloses 10 DecConstructionReplacement of Kitchen Interior Finishes — École secondaire de la Pointe-aux-TremblesCloses 9 DecConstructionExterior Envelope Refurbishment and Related Works at École du Soleil‑Levant, LatulipeCloses 26 NovConstructionArchitectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardCloses 9 DecConstructionInterior Reconfiguration, Cladding and Window Repairs — Centre Éducation des Adultes des Patriotes (CEAP) Marie-VictorinCloses 1 DecConstructionAddition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieCloses 8 DecConstruction
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





