Stantec / WSP (7007-22-FE04)
Supplier · Infrastructure
Stantec / WSP (7007-22-FE04)
Won in the last 12 months$37M2 contractsValue won per quarter, last three years
Contracts on record2$37M in total
Running now0Latest win Nov 2026
Next contract endingNone dueNo contracts ending in the next three years
Biggest buyerMinistère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics)50% of their value
What they win
How much they win each year, the size of a typical contract, and every contract on record.
Who they win it from
Their biggest government buyers and how much of their work each one is.
Most of their work comes from one buyer: Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics), 50% of value.
Coming up
Contracts that end soon and may go back out to tender.
About them
Company details, where they work and the names they trade under.
Also traded asStantec / WSP (7007-22-FE04)
Open tenders that match their work
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Closes 24 NovInfrastructureConstruction of Bridge P-19986 on Route 289 over Rivière Bleue (Rivière-Bleue)Closes 19 NovInfrastructurePreliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneCloses 7 DecInfrastructureRoad Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Closes 7 JanInfrastructureEngineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheCloses 19 NovInfrastructureReconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesCloses 9 DecInfrastructureReconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractCloses 10 DecInfrastructureConstruction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Closes 23 NovInfrastructureConstruction of Bridge P-20696 on Rang Saint-Jérôme over Rivière Rémy, Baie-Saint-PaulCloses 4 DecInfrastructureDesign and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeCloses 26 NovInfrastructureMunicipal Infrastructure Works on Chemin des Quatre-Bourgeois – TW-04BCloses 26 NovInfrastructureRehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverCloses 26 NovWater & Sanitation
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





