Tender: Installation of 100 kW Photovoltaic (PV) Solar System – Prince Edward Island National Park (Stage 1 Prequalification)
Released 1 day ago
About
Parks Canada is seeking a general contractor with electrical experience to install a 100-kilowatt (kW) photovoltaic (PV) solar system at Prince Edward Island National Park. This posting is Stage One of a two-stage selection process to prequalify suppliers; bidders who qualify in Stage One will be invited to Stage Two for further qualifications and a Two-Envelope invitation-to-tender that will include an Indigenous Participation Plan and a financial evaluation. The contracted work must be completed no later than March 31, 2027. For Stage One submissions, Parks Canada will accept bids by email to [email protected] or by facsimile to 1-855-983-1808 (maximum email file size 15 MB); enquiries must be submitted in writing no later than five business days before closing.
Tender breakdown
From 2 documentsSite visit is MANDATORY; bidder's representative must sign the Site Visit Attendance Sheet; bids from bidders who did not sign will be rejected
Stage One mandatory requirement M1: Bidder must have substantially completed two (2) PV solar installation projects within last 5 years; only two projects will be considered
For at least one of the two projects the Bidder must have been Prime Contractor (not a subcontractor)
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents2
Grouped by what each file is for
Similar open tenders11
Similar awarded contracts4
Likely value $90K to $320KAgency spend history
Parks CanadaContract size
What Parks Canada has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





