Tender: Phase 1 Fleet EV Charging Station Installation at Medium Institution

Released 4 days ago

Closes30 Nov 2026
Likely valueEstimate$90K to $450K
LocationBritish Columbia
SourceCanadaBuys
CategoryEnergy & Environment
ReferenceWS5984376439
11 days leftCloses Mon, 30 Nov 2026

Medium Institution is seeking a supplier for the Phase 1 installation of a fleet vehicle charging station, including installing new OCP and metering in the existing MDP located in the existing generator building; trenching and installing conduit and cabling between the existing pull box (PWR-3B) and the proposed EVSE enclosure location; installation of the EVSE enclosure and transformers with structural pads; trenching and installing conduit and cabling between the EVSE enclosure and new L2/L3 EV chargers; and commissioning and testing of the distribution equipment.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month