Tender: Reconstruction of 73.2 m Marginal Wharf – Port au Choix, NL (Fisheries and Oceans Canada)

Released 9 days ago

Closes01 Dec 2026
Likely valueEstimate$3.8M to $13.7M
LocationPort Au Choix, Newfoundland and Labrador
SourceCanadaBuys
CategoryInfrastructure
Reference30008322
11 days leftCloses Tue, 1 Dec 2026

Fisheries and Oceans Canada (DFO) is seeking a contractor to reconstruct approximately 73.2 metres of the marginal wharf at Port au Choix, NL, providing all plant, labour, equipment and materials in accordance with the contract documents. The work includes site mobilization and demobilization, excavation, partial demolition and removal of existing crib work, surveying, dredging overburden to bedrock for a rock mattress, construction of timber cribwork with rock ballast and associated fendering, wheelguard, blocking, Type A cleats and blocks and ladders, supply and placement of quarried rock fill and Class A and Class B granular material, asphalt paving, scour protection, reinforced concrete wharf deck and upland slab on grade, catch basins with outlet pipes, removal/salvage/reinstallation of a precast concrete block retaining wall, and electrical work for street lights, shore power pedestals and a new 600 AMP single phase electrical service. Bidders are recommended to visit the site to verify conditions, review Section 01 35 28 - Health and Safety Requirements before visiting, and allow for weather, soil and access considerations; the anticipated contract completion date is no later than March 31, 2029.

Tender breakdown

From 3 documents
wharf reconstruction / marine constructionLump sum
Watch out for7

Diving operations have strict certification and medical requirements (Category 1 or Unrestricted Surface-supplied Certificate; <1‑year medical from licensed NL diving physician); free‑swim diving is prohibited

You must provide and pay for inspector board & lodging on site meeting specified requirements — this is a contract requirement, not optional

Failure to submit required Health & Safety Plan, Lockout Procedures, Hot Work Procedures, or required submittals in time is not grounds for extension — allow review times (7–14 days) when planning mobilization

Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.

Documents3

Grouped by what each file is for

Tender documents1The main request: what they want, how to respond and the rules.
Scope and specifications1What is being bought: the work, standards and requirements.
Drawings, plans and photos1Site plans, design drawings, CAD files and photos.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month