Tender: Renovation of Medical Device Reprocessing Department – Drumheller Health Centre (Phase 1 Demo, Site Works & Building Envelope)
Released 6 days ago
About
Shunda Consulting and Construction Management Ltd., on behalf of Alberta Infrastructure, is seeking a supplier for the renovation of the Medical Device Reprocessing Department at Drumheller Health Centre. This Tender Package 2 covers demolition and pre-works for the Phase 1 space, together with associated site works and building envelope work.
Tender breakdown
From 5 documentsNDA is required and must be fully executed before receiving access to drawings/specs; failure may deny access and participation
Site access is restricted and pre-bid walkthrough may be the only chance to inspect site (attendance strongly advised)
Extensive bonding requirements (100% trade bond for >$100k) and dual obligee rider make sure bonding capacity and timelines are available
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents5
Grouped by what each file is for
Similar open tenders12
Similar awarded contracts4
Likely value $490K to $1.8MAgency spend history
Alberta InfrastructureContract size
What Alberta Infrastructure has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





