Tender: Replacement of Two-Span Timber Deck/Girder Bridge with Single-Span SL-510 Prestressed Girders — H‑Piles, Riprap, Guardrail and Silt Fence
Released 3 months ago
About
Construction contractor needed to remove and dispose of the existing two-span (6.1 m + 6.1 m) treated timber deck/girder bridge on timber piles and to supply, set up and drive galvanized and plain steel H-piles at abutments; construct SPCS abutments backwalls and wingwalls with new steel H-pile abutment caps and stiffener plates; place Class 1 heavy rock riprap; fabricate, deliver and erect a single-span (1–14 m) type SL-510 prestressed girder assembly; backfill bridge ends; supply and install new TL-2 low-height thrie beam bridgerail and approach rail transition, approach road guardrail, roadway work, and supply and install silt fence.
This opportunity is suited to bridge contractors with experience in H-pile driving, SPCS abutment construction, prestressed girder fabrication/erection, riprap placement and guardrail installation. Key considerations include capacity for timber bridge removal and disposal, handling and erection of up to 14 m SL-510 girders, and managing placement of Class 1 heavy rock riprap and silt fencing.
Similar open tenders12
Agency spend history
Municipal District of Bonnyville No. 87Contract size
What Municipal District of Bonnyville No. 87 has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





