Carbon Flood Study Awarded to Barr Engineering for Kneehills Creek Hazard Assessment
Alberta Environment and Protected Areas · Awarded contract
AwardedCarbon Flood Study Awarded to Barr Engineering for Kneehills Creek Hazard Assessment
Awarded 01 Apr 2025
Awarded01 Apr 2025
Value$208,635.00
SupplierBARR ENGINEERING ENV.&SCI
ProvinceAlberta
CategoryEnergy & Environment
Expires in 4mo1y 12mo term, 82% elapsed
Awarded 1 Apr 2025Expires 31 Mar 2027
About
Alberta Environment and Protected Areas awarded a contract to Barr Engineering Env.&Sci for the Carbon Flood Study, which assessed and identified open water flood hazards along Kneehills Creek through Carbon and Kneehill County.
The contract value was $208,635.
Similar open tenders12
TenderCloses
Flood Hazard Mapping Study for Northern Village of Cumberland House, SaskatchewanWater & Sanitation
11 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Geotechnical Assessment of Former Smoky River Coal Mine – Slope Stability Investigation (Grande Cache, AB)Mining & Natural Resources
18 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Fish Habitat Compensation Monitoring, Compliance and Design Services – City of CalgaryEnergy & Environment
10 Dec 2026
Riprap Improvements at Keho, Chain Lakes and Pine Coulee Reservoirs — AlbertaInfrastructure
25 Nov 2026
Protection of Sanitary Infrastructure at Risk and Watercourse Restoration — Highland Creek Valley Segment 3Water & Sanitation
20 Nov 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Construction and Removal of Clay Dike Closures for Flood Response – Brunkild, MBInfrastructure
03 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far