The City of Leduc awarded a contract to CKB Construction Ltd.
for the 54 Avenue Storm 2026 project, which involves underground storm sewer installation and surface rehabilitation.
The work includes site preparation, traffic control, removal of existing hard surfacing, hydrovac excavation, installation of storm sewer mains and manholes (including 2100mm perched and 2400x2400mm box manholes), structural support and steel encasement of an existing utility duct bank, fillcrete backfill, and asphalt paving over the trench alignment.
Provisional items include removal of existing water distribution infrastructure and water main installation.
The contract value is CAD 707,616.25.