City of St. Albert · Awarded contract
Awarded

Consulting Services for Carrot Creek Erosion and Sediment Control Detailed Design and Construction Management

Awarded 03 Nov 2025

View live tenders
Awarded03 Nov 2025
Value$529,709.55
SupplierStantec
ProvinceAlberta
CategoryConsultancy & Legal
Expires in 1y 5mo2y 6mo term, 42% elapsed
Awarded 3 Nov 2025Expires 19 Apr 2028

The City of St.

Albert awarded a contract to Stantec for comprehensive review, detailed design engineering, and construction management services for the Carrot Creek Erosion and Sediment Control project at multiple locations.

The project focuses on implementing five priority improvements identified in the 2022 Carrot Creek Regional Drainage Master Plan, including erosion protection, riprap, bioengineered options, and culvert upgrades to enhance bank stability, preserve riparian areas, improve stormwater conveyance, and ensure resilience.

The contract value is $529,709.55.

Similar open tenders12

Engineering and Consulting Services for Telford Lake Stormceptors and Deer Creek Erosion Rehabilitation — City of LeducWater & Sanitation
04 Dec 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
RQB Drainage Enhancements – Sturgeon CountyInfrastructure
08 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Engineering Design and Construction Management for Building Over Wet Well at River's Gate Lift Station (Odour Management)Water & Sanitation
01 Dec 2026
Remediation and 205m Drainage Channel Realignment — Rural Municipality of Montcalm (Manitoba)Water & Sanitation
01 Dec 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026

Suppliers similar to Stantec8

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.