Corrosion Inspection and Assessment of Spillway Gates at Oldman River, St. Mary, and Waterton Dams
Awarded 15 Jul 2024
About
Alberta Agriculture and Irrigation awarded a contract to ASM Corrosion Control a Div.
of Caproco (1987) Ltd.
for two detailed site investigations and a report on metal corrosion of spillway gate components at the Oldman River Dam and St.
Mary Dam, plus an assessment of anode bed lifespan management at the Waterton Dam.
The work included inspections of upstream and downstream sides of spillway gates and all applicable components, measuring corrosion change since prior inspections in 2013-14 and 2019-20, and providing recommendations to prevent or mitigate further corrosion and monitoring methods for the Water Infrastructure and Operations Branch.
The contract value was $74,348.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





