Emergency Stabilization of Haldimand Bridge at MP 97.60, Chandler Subdivision
Ministère des Transports et de la Mobilité durable (Direction générale de la gestion contractuelle) · Awarded contract
AwardedEmergency Stabilization of Haldimand Bridge at MP 97.60, Chandler Subdivision
Awarded 15 Oct 2026
Awarded15 Oct 2026
Value$1,100,000.00
AgencyMinistère des Transports et de la Mobilité durable (Direction générale de la gestion contractuelle)
ProvinceQuebec
CategoryInfrastructure
About
Ministère des Transports et de la Mobilité durable (Direction générale de la gestion contractuelle) awarded a contract to Groupe Séma structures ferroviaires inc.
for emergency stabilization work on the Haldimand Bridge at mile post 97.60 in the Chandler subdivision.
The contract, valued at CAD 1,100,000, was awarded through a non-competitive (gré à gré) process.
Similar open tenders12
TenderCloses
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction of Bridge P-20111 on Hamon Street over the Nelson River — QuébecInfrastructure
25 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Construction Administration & Site Inspection for Highway No. 3 Bridge Replacement over Sturgeon River (west of Prince Albert)Infrastructure
23 Nov 2026
Reconstruction of A-20 West in Concrete — Complex Bridge and Tunnel Construction & Repair (Chaudière-Appalaches)Infrastructure
07 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of HighwaysInfrastructure
30 Nov 2026
Reconstruction of Structure P-02422, L'Anse-Saint-Jean – Qualified Complex Bridge/Tunnel Works ContractInfrastructure
10 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





