Tender: Construction Administration for Highway No. 8 Bridge Replacements over Bighorn Brook and Spruce Creek – Saskatchewan Ministry of Highways
Released 15 days ago
About
Saskatchewan Ministry of Highways is seeking a consultant to provide construction administration services for replacement of the existing bridges on Highway No. 8 over Bighorn Brook (approximately 33.3 km north of Norquay, SK) and over Spruce Creek (approximately 1.6 km north of Norquay, SK), with new bridges planned for Summer 2027. The assignment (Project B26078) is issued under SFRFP 260053 and falls under the CA - Bridge category of work; proponents with probationary pre-qualified status should reference the Professional Services Procurement Manual (PSPM 100-04) and contact the competition contact indicated in SFRFP 260053 for questions about eligibility.
Tender breakdown
From 6 documentsYou must be pre-qualified under competition HWY-PreQ2026-28 to bid
Mandatory hours (SLS, PM, OSS and Schedule A Section 4.9.1) must be included exactly in financial submission; deviations may lead to non-evaluation
Submission must not exceed 12 pages (technical template) and must use 12-point font or risk 5-point penalty to Technical score
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents6
Grouped by what each file is for
Similar open tenders9
Similar awarded contracts3
Likely value $150K to $700KAgency spend history
Saskatchewan HighwaysContract size
What Saskatchewan Highways has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





