Tender: Construction Administration for HWY 905 (Wathaman River) and HWY 919 (Martineau River) Bridge Replacements – Saskatchewan
Released 14 days ago
About
Saskatchewan Ministry of Highways is seeking a supplier for construction administration services for the replacement of Highway No. 905 bridge over the Wathaman River (C.S. 905-02, km 35.46) and the replacement of Highway No. 919 bridge over the Martineau River (C.S. 919-02, km 19.05). The work includes dismantling the existing Hwy 905 bridge, constructing a new bridge on Hwy 905, and replacing the Hwy 919 bridge with the dismantled truss from Hwy 905; construction administration is required during the planned Spring/Summer 2027 construction period (B26114). Reference: SFRFP 260054.
Tender breakdown
From 8 documentsYou must be pre-qualified under HWY-PreQ2026-28 to bid; non-pre-qualified cannot submit
Technical submission template max 14 pages (cover and specified appendices excluded); pages past limit will not be evaluated and smaller font may incur 5-point penalty
Financial Submission must include all Mandatory Hours/Requirements per Schedule A Section 4.7; deviations from Schedule A values may cause non-evaluation
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents8
Grouped by what each file is for
Similar open tenders9
Similar awarded contracts5
Likely value $250K to $4.2MAgency spend history
Saskatchewan HighwaysContract size
What Saskatchewan Highways has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





