Environmental Characterization Study for Pierre-Laporte Bridge Interchange and Quebec Lots
Ministère des Transports et de la Mobilité durable (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedEnvironmental Characterization Study for Pierre-Laporte Bridge Interchange and Quebec Lots
Awarded 06 Nov 2020
Awarded06 Nov 2020
Value$30,351.04
SupplierGHD Consultants Ltée
ProvinceQuebec
CategoryEnergy & Environment
Ended 1y 9mo ago4y 3mo term
Awarded 6 Nov 2020Expired 10 Feb 2025
About
Ministère des Transports et de la Mobilité durable awarded a contract to GHD Consultants Ltée for a Phase I and II environmental characterization study and attestations for several lots at the Pierre-Laporte Bridge interchange and in Quebec (Capitale-Nationale), under the environmental management category, following an invitation-based tender, valued at CAD 30,351.04.
Similar open tenders12
TenderCloses
Environmental, Regulatory, Engineering and Design Support for Mackenzie Valley Highway Project – GNWT Department of InfrastructureInfrastructure
08 Dec 2026
On-Demand Environmental Services for Road Projects — Laurentides & LanaudièreEnergy & Environment
07 Jan 2027
Environmental, Regulatory, Engineering and Design Support for Mackenzie Valley Highway ProjectInfrastructure
08 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Phase I & II Environmental Site Assessments for Fort Simpson HC & LTC Facility – GNWT Department of InfrastructureEnergy & Environment
08 Jan 2027
Material Quality Control for Maintenance Works on Honoré‑Mercier Bridge Structures P-03226 & P-03228 — Montréal and KahnawakeInfrastructure
30 Nov 2026
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





