Fence and Service Door Replacement and Science Lab Fit-Out for English-Montreal School Board
Commission Scolaire English-Montreal · Awarded contract
AwardedFence and Service Door Replacement and Science Lab Fit-Out for English-Montreal School Board
Awarded Unknown
AwardedNot specified
Value$107,995.26
SupplierRium architecture inc.
ProvinceQuebec
CategoryConstruction
About
Commission Scolaire English-Montreal awarded a contract to Rium architecture inc.
for the replacement of fencing and service doors and the fit-out of a science lab, valued at CAD 107,995.26.
The contract was awarded through a non-competitive (sole-source) procurement process.
Similar open tenders12
TenderCloses
Replacement of Windows and Doors – École primaire J.P. LabarreConstruction
25 Nov 2026
Science Laboratory Upgrade – École Gilbert-Théberge, TémiscamingConstruction
03 Dec 2026
Mechanical, Electrical and Structural Engineering Services for Courtyard, Building Envelope and Interior Renovation of École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
École du Boisé – Replacement of Windows, Masonry Cladding and Renovation WorksConstruction
24 Nov 2026
Addition of Exit Doors to Cafeteria and Multipurpose Hall – École METConstruction
11 Dec 2026
Architectural Services (2 Lots): Building Envelope Renovation at École primaire Léon-Guilbault (Bldg 1) and École hôtelière et d’administration de Laval — Édifice CunardConstruction
09 Dec 2026
Window Replacement at École Pie‑X‑de‑l'AssomptionConstruction
07 Dec 2026
Renovation of RCMP Detachment Building – Steinbach, ManitobaConstruction
27 Nov 2026
Architectural Services for Courtyard, Building Envelope and Interior Refurbishment — École secondaire de l'Odyssée LafontaineConstruction
15 Dec 2026
Renovation of Science Rooms (Phase 1) and EHDAA Sector Level 200 — Polyvalente La Samare, PlessisvilleConstruction
26 Nov 2026
Exterior Building Envelope Upgrade – Polyvalente La Frontalière (Coaticook)Construction
03 Dec 2026
Addition of Tempered Ventilation, Building Envelope Repairs and Interior Reconfiguration — École Mgr Feuiltault, Sainte‑MarieConstruction
08 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Fence and Service Door Replacement and Laboratory Fit-Out for English-Montreal School BoardConstructionXO CONSTRUCTION INC.
$938,000
Fence and Service Door Replacement and Laboratory Renovation at English-Montreal School BoardConstructionXO CONSTRUCTION INC.
$938,000
Architectural Services for Door Replacement and Interior Fit-OutConstructionCHEVALIER MORALES ARCHITECTES INC.
$25,372.32
Architectural Services for Door Replacement and Interior Fit-OutConstructionCHEVALIER MORALES ARCHITECTES INC.
$38,157.23
Ventilation Phase 2, Door Replacement, and Roof Refection at English-Montreal School BoardConstructionScience du bâtiment Alta
$16,801
Replacement of Stairwell Windows and Doors for Commission Scolaire English-MontrealConstructionScience du bâtiment Alta
$60,488
Replacement of Exterior Doors, Mechanical Systems, and Locker Room Renovation for English-Montreal School BoardConstructionXO CONSTRUCTION INC.
$1,198,000
Ventilation Phase 2, Door Replacement, and Roof Refection at Commission Scolaire English-MontrealConstructionScience du bâtiment Alta
$94,310.8
Replacement of Exterior Doors, Mechanical Systems, and Locker Room Redevelopment for English-Montreal School BoardConstructionXO CONSTRUCTION INC.
$1,244,486.88
Tile Replacement and Glass Door Relocation at English-Montreal School BoardConstructionConstruction Fluet Inc.
$566,265.15
Replacement of Exterior Doors for Commission scolaire New FrontiersConstructionROMCOBAT BÂTIMENTS INC.
$449,140.51
Replacement of Pool Stair Doors at English-Montreal School BoardConstructionCormier Lefebvre Architectes
$44,900
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





