Foundation Drain Replacement at Chanoine-Morel by Maximum Excavation
Centre intégré universitaire de santé et de services sociaux de la Capitale-Nationale 1 · Awarded contract
AwardedFoundation Drain Replacement at Chanoine-Morel by Maximum Excavation
Awarded 06 Oct 2023
Ended 3y 2mo ago
Awarded 6 Oct 2023Expired 6 Oct 2023
About
Centre intégré universitaire de santé et de services sociaux de la Capitale-Nationale 1 awarded a contract to MAXIMUM EXCAVATION INC.
for the replacement of the foundation drain at Chanoine-Morel.
The contract, valued at CAD 66,958.65, was awarded through a non-competitive (sole-source) process under the categories of claims and loss prevention services.
Similar open tenders12
TenderCloses
Urgent French Drain Replacement for Building MaintenanceConstruction
20 Nov 2026
Cleaning of Drainage Elements (manholes, catch basins, pipes, culverts) – Saint-Jean-sur-Richelieu (Montérégie)Water & Sanitation
10 Dec 2026
Renovation of Foundations and Crawl Space – École Coeur-Immaculé-de-MarieConstruction
09 Dec 2026
Sanitary Sewer Repair and New Drain Pipe Installation – Northern Forestry Centre, EdmontonWater & Sanitation
19 Nov 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Cleaning and Reprofiling of Ditch Beds and Culverts — Chemin Saint-EmmanuelInfrastructure
30 Nov 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Remediation and 205m Drainage Channel Realignment — Rural Municipality of Montcalm (Manitoba)Water & Sanitation
01 Dec 2026
Parking Lot and Paved Areas Recapitalization – Asphalt Replacement, Drainage Upgrades and Regrading (Complete by March 31, 2027)Construction
27 Nov 2026
Sanitary Maintenance for Centre Socioculturel – Édifice des Soeurs du Bon Conseil, Arrondissement de ChicoutimiPublic Services & Welfare
07 Dec 2026
Reconstruction of Underground and Surface Infrastructure on Avenue Lamothe, Morison and Papineau (Phase 1 – Delorme Overflow Basin)Infrastructure
20 Nov 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open construction tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





