Awarded

Independent Evaluation of Restructured Energy Market Design and ISO Rules by ECCO International

Awarded 07 Apr 2025

View live tenders
Awarded07 Apr 2025
Value$156,000.00
ProvinceOutside Canada
CategoryConsultancy & Legal
Ended 1y 6mo ago2mo term
Awarded 7 Apr 2025Expired 30 May 2025

The Alberta Electric System Operator awarded a contract to ECCO International, Inc.

for an independent, high-level evaluation of the reasonableness of the AESO's design of the restructured energy market (REM) and a subsequent evaluation of whether the ISO rules related to REM reasonably reflect the REM design.

The services include delivery of an interim report on May 12, 2025, and a final report on May 30, 2025, with the requirement that the successful bidder perform impartially and without bias, and have no real or apparent conflicts of interest or mitigate any such conflicts to the satisfaction of the AESO.

The contract value is CAD 156,000.

Similar open tenders12

Distribution and Transmission Study to Address Forecasted Load Deficiency in South‑West Edmonton (Chappelle)Energy & Environment
03 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
AESO Consultant Needed to Revise Functional Specification for EATL/WATL HVDC Protection and Controls UpgradeInfrastructure
23 Nov 2026
Energy Performance Contract Procurement and Financial Advisory Services – Defence Construction CanadaConsultancy & Legal
04 Jan 2027
Edmonton School Division – Electric Energy Contract‑for‑Difference (Fixed‑for‑Floating Hedge) RFSQEnergy & Environment
31 Dec 2026
External Financial Statement Audit Services for Office of the Information Commissioner of Canada (OIC)Consultancy & Legal
20 Nov 2026
AESO Network Managed Services – Up to 5-Year Contract Starting January 2028IT & Software
10 Dec 2026
Specialized Test-Grade Fuel Supply for Vehicle and Engine Emissions Testing — ECCC Ottawa (Dec 2026–Nov 2028)Energy & Environment
20 Nov 2026
Construction Contractors Pre-Qualification – Alberta Energy Regulator (AER)Construction
01 Mar 2030
Deep Energy Retrofit Feasibility Study & Decarbonization Roadmap for Five Municipal Facilities – City of LacombeEnergy & Environment
20 Nov 2026
Economic, Fiscal and Environmental Scenario Analysis Modelling Services – Alberta Standing OfferConsultancy & Legal
31 May 2027
Manitoba Public Insurance – Renewal Pricing for Mercer International Position EvaluatorIT & Software
27 Nov 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open consultancy and legal tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.