On-Site Mixing of 45,000 Tonnes of Cold Mix Asphalt at Richland Pit
Awarded 15 May 2025
About
County of St.
Paul No.
19 awarded a contract to Grynn Contracting Ltd for on-site mixing of approximately 45,000 tonnes of cold mix asphalt at the County's Richland Pit, in batches no larger than 4,000 tonnes as requested, plus up to 2,000 tonnes of patching material (half stockpiled at Richland Pit, remainder at the County yard in St.
Paul) in batches no larger than 1,000 tonnes.
The contractor supplied its own loader and mixer, with all gravel and oil provided by the County, and was responsible for drying gravel, maintaining oil temperature at a minimum of 125°F into the mixer, and producing final product between 190°F and 210°F per the County's engineering mix design.
The contract value was CAD 667,350.