R.M. of Enniskillen No. 3 is seeking a contractor to perform gravel crushing at SE-2-3-1-W2. Bidders must provide separate crushing rates per cubic yard for each product under four total quantity options: 25,000 cubic yards (15,000 road gravel, 5,000 1½-inch gravel, 5,000 bridge rock); 50,000 cubic yards (40,000 road gravel, 5,000 1½-inch gravel, 5,000 bridge rock); 75,000 cubic yards (65,000 road gravel, 5,000 1½-inch gravel, 5,000 bridge rock); and 100,000 cubic yards (90,000 road gravel, 5,000 1½-inch gravel, 5,000 bridge rock). Road gravel shall be ¾-inch or ?-inch minus. Bidders must show unit rates, extended product totals and the total price for each option and identify costs not included in crushing rates (including stripping, mobilization, fuel surcharges, additional screening or blending, taxes and other anticipated costs) with a separate line item for fines rejection. Tenders must be received by November 30, 2026 at 4:00 p.m. Saskatchewan time, clearly marked "Gravel Crushing" and delivered to R.M. of Enniskillen No. 3, 307 Main Street, P.O. Box 179, Oxbow, SK S0C 2B0 or faxed to 306-483-2598. A jaw crusher and adequate equipment for continuous production are required. Submissions must include estimated recoverable gravel quantities; proposed start and completion dates and expected crushing schedule; a minimum of three references; proof of General Liability and Property Damage Insurance with minimum coverage of $5,000,000 inclusive; valid Saskatchewan WCB clearance or Letter of Good Standing; and a certified cheque or bid bond equal to at least 10% of the total bid for the 50,000-cubic-yard option (electronic submissions must include a copy of the bid bond and the successful contractor must provide the original after award). The successful contractor must provide a performance bond equal to 50% of the accepted option amount (excluding GST) within 14 days of award. Measurement and payment will be based on the contractor’s Volume Report verified by an independent surveyor. The R.M. will retain a 10% holdback until final inspection, correction of deficiencies, Council confirmation of compliance and submission of executed Final Release and Waiver of Lien documentation. Contractors proposing 24-hour operations must meet with Council before work begins to discuss sound mitigation and barrier requirements; extra work requires prior written approval from R.M. Council. Contractors are responsible for inspecting the site; to arrange a site inspection contact Matt Faber, Foreman, at 306-485-7510. No official public tender opening date has been set; bidders will be notified following completion of the tender opening process. Refer to the tender documents for complete requirements and conditions.
Tender breakdown
From 2 documentsPerformance bond due within 14 days of award equal to 50% of accepted option amount (excl. GST) — large security requirement
R.M. retains 10% holdback until final release documentation and Council confirmation — could delay final payment
Bid security equal to 10% of total bid amount required for 50,000-cy option (copy allowed electronically but original required on award) — ensure funds available
Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.
Documents2
Grouped by what each file is for
Similar open tenders9
Similar awarded contracts9
Likely value $450K to $2.2MAgency spend history
Rural Municipality of Enniskillen No. 3Contract size
What Rural Municipality of Enniskillen No. 3 has spent, year by year and by contract size, and who won the work.
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.