Poundmaker Snow Storage Site Upgrades Constructed by Sureway Construction
Awarded 16 Feb 2026
About
The City of Edmonton awarded a contract to Sureway Construction Management Ltd for the construction of the Poundmaker Snow Storage Site Upgrades, valued at CAD 16,720,844.18.
The work included mobilization and demobilization, site management, removal of existing manholes, fence, gate, light poles, pond liner, asphalt and concrete, site earthwork and subgrade preparation, construction of a new settling pond with HDPE liner and hard surfacing, construction of pond inlet and outlet structures with gates and walking platform on piles, installation of underground stormwater pipes and manholes via open cut and vertical trench methods and tie-in to existing infrastructure under 107 Avenue, hard surfacing of the Snow Storage Pad, Equipment Area, Access Road and Drainage Swales, installation of new fences, gates, and lights, landscaping with topsoil and seeding, site cleanup, warranty and maintenance, and final inspection and contract closeout.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





