Preliminary Design for Intersection Redevelopment of Routes 241 and Boulevard Bromont
Ministère des Transports (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedPreliminary Design for Intersection Redevelopment of Routes 241 and Boulevard Bromont
Awarded 26 Nov 2019
Ended 4y 12mo ago2y term
Awarded 26 Nov 2019Expired 26 Nov 2021
About
The Ministère des Transports (Direction de l'administration des appels d'offres publics) awarded a contract to FNX-Innov inc.
for the preliminary design (PC-3) of the intersection redevelopment at Routes 241 and Boulevard Bromont in Bromont, under a standing offer contract program.
The contract, valued at CAD 34,430.24, covers engineering services related to transport infrastructure.
Similar open tenders12
TenderCloses
Redevelopment of Intersections at Chemin de la Bataille Nord‑Sud and Chemin de Fontarabie with Route 104 — La PrairieInfrastructure
19 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Major Bridge Design for Four Alberta Highway Crossings (Ponton River, Melito Creek, Kemp River, CNR Railway)Infrastructure
24 Nov 2026
Upgrade of Pedestrian Crossings and FRCR Installation on Route 229 opposite INRS, VarennesInfrastructure
25 Nov 2026
Redevelopment of Ernest-Anctil, des Pyrénées and des Équinoxes Streets — Bois-FrancInfrastructure
25 Nov 2026
School Crossing Installation and Pavement Rehabilitation on Route 393 - Abitibi-TémiscamingueInfrastructure
07 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Reconstruction of Two Overpass Bridges on Autoroute 40 (Québec) — Complex Bridge/Tunnel Works ContractInfrastructure
27 Nov 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Bridge Replacement Carrying HWY 842 over Bow River (NE 9-21-21-W4M) – Alberta Transportation RFPInfrastructure
07 Dec 2026
Design and Construction Services for 1:18 Safety Rest Area (km 48.000–54.500) — Alberta Transportation and Economic CorridorsInfrastructure
30 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





