Town of Stettler · Awarded contract
Awarded

Rehabilitation of Highway 12 and Highway 56 in Stettler

Awarded 01 Jul 2024

View live tenders
Awarded01 Jul 2024
Value$871,913.95
ProvinceAlberta
CategoryInfrastructure
Ended 2y 2mo ago3mo term
Awarded 1 July 2024Expired 30 Sept 2024

The Town of Stettler awarded a contract to Ruby Rock Asphalt Works Ltd.

for the rehabilitation of Highway 12 and Highway 56, involving approximately 13,870 square metres of asphalt milling at a minimum depth of 50mm, 2,455 tonnes of asphalt installation, provisional base repair of 2,050 square metres with 300mm pitrun and 200mm gravel, and the replacement or upgrade of four highway pedestrian crossings.

The contract value is CAD 871,913.95.

Similar open tenders12

Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Minor Grading, Cold Milling and Asphalt Paving on Highway 576:02 (Km 16.080–29.120) — 2 km East of Hwy 849 to Hwy 851Infrastructure
01 Dec 2026
Hwy 2 & Hwy 12 Minor Grading, Cold Milling and Asphalt Concrete Pavement Works — Central AlbertaInfrastructure
08 Dec 2026
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Highway 16 Rehabilitation and Associated Works — Interchange Rehab, Overlays, Lighting, Drainage (Alberta)Infrastructure
25 Nov 2026
Asphalt Concrete Pavement and Roadworks – Hwy 661 to Hwy 663 & Hwy 663 to Hwy 2, North Central RegionInfrastructure
15 Dec 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Grade Widening & Intersection Improvements – Stoney Trail at 52 Street SE (Eastbound Exit Lane & Dual Northbound-to-Westbound Right Turn)Infrastructure
14 Dec 2026
Design and Tender Package for Grading and Surfacing of Highway No. 106 (Tyrrell Lake Access Rd to Hwy 167) — Saskatchewan Ministry of HighwaysInfrastructure
26 Nov 2026
Weston Road Resurfacing, Bikeway Construction and Pedestrian Safety Upgrades — 70 m south of Lanyard Road to Steeles Avenue WestInfrastructure
30 Nov 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month

You're In — Free Trial Activated

You now have full access to GovMarket Premium for 7 days. You’ll be charged at the end of the trial unless you cancel.

  • Tell Us What You Do — We'll surface the tenders that are most relevant to your business.