Replacement of Bridge P-00929 Deck and Approach Reconfiguration over Rivière du Pin in Armagh
Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) · Awarded contract
AwardedReplacement of Bridge P-00929 Deck and Approach Reconfiguration over Rivière du Pin in Armagh
Awarded 09 Sep 2011
Awarded09 Sep 2011
Value$598,532.50
SupplierCONSTRUCTION CARBO INC.
ProvinceQuebec
CategoryInfrastructure
Ended 11y 10mo ago3y 5mo term
Awarded 9 Sept 2011Expired 10 Feb 2015
About
The Ministère des Transports et de la mobilité durable (Direction de l'administration des appels d'offres publics) awarded a contract to Construction Carbo Inc.
for the replacement of the deck of bridge P-00929 and the reconfiguration of its approaches on rang Sainte-Anne over the Rivière du Pin in Armagh.
The contract, valued at CAD 598,532.5, falls under the infrastructure maintenance and repair category.
Similar open tenders12
TenderCloses
Construction of Bridge P-20696 on Rang Saint-Jérôme over Rivière Rémy, Baie-Saint-PaulInfrastructure
04 Dec 2026
Bridge Rehabilitation – Highway 36 over Red Deer River near Duchess, ABInfrastructure
26 Nov 2026
Dunvegan Bridge Rehabilitation (BF73949) – Highway 2:68 over the Peace RiverInfrastructure
27 Nov 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Construction of Bridge P-19986 on Route 289 over Rivière Bleue (Rivière-Bleue)Infrastructure
19 Nov 2026
Reconfiguration of Intersections at Routes 25, 125, 158 and Rue Saint-Isidore — Saint-EspritInfrastructure
09 Dec 2026
Reconstruction of Route 604 Bridge (Gourganne Sector) – Réserve faunique des LaurentidesInfrastructure
09 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Bridge and Gap Crossing Modernization: Procurement of New Bridging Systems for the Department of National DefenceDefense & Aerospace
31 Mar 2027
Engineering Services for Rehabilitation of Wooden Footbridge – Parc métropolitain du Domaine‑Seigneurial‑de‑MascoucheInfrastructure
19 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





