Riverbank Stabilization and Erosion Repair on Township Road 593A and Cutbanks Road near Whitecourt
Woodlands County · Awarded contract
AwardedRiverbank Stabilization and Erosion Repair on Township Road 593A and Cutbanks Road near Whitecourt
Awarded 01 Jun 2026
Awarded01 Jun 2026
Value$2,396,493.19
SupplierWhitecourt Transport
AgencyWoodlands County
ProvinceAlberta
CategoryInfrastructure
Ended 1mo ago5mo term
Awarded 1 June 2026Expired 15 Oct 2026
About
Woodlands County awarded a contract to Whitecourt Transport for riverbank stabilization and erosion repair at two locations along the McLeod River near Whitecourt, Alberta: Township Road 593A at Old Ferry Loop Road and Cutbanks Road.
The work addresses unstable, undercut riverbanks caused by the 2023 floods, which posed a risk to the nearby roads.
The project involves in-stream work, primarily installing riprap below the high-water mark, and requires erosion and sedimentation controls to mitigate sediment input into the watercourse for the duration of the project.
The contract value is CAD 2,396,493.19.
Similar open tenders12
TenderCloses
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Bridge Rehabilitation – Highway 49 over Spirit River at West Boundary of Rycroft (km 34.437)Infrastructure
17 Dec 2026
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Design and Construction Consultancy for Culvert Replacement on Hwy 88:04 near Slave Lake and Hwy 2:44 near Island LakeInfrastructure
26 Nov 2026
Riprap Improvements at Keho, Chain Lakes and Pine Coulee Reservoirs — AlbertaInfrastructure
25 Nov 2026
Engineering Consultant Services for Culvert and Bridge Replacements on Highways near Nordegg, Sundre and Didsbury, AlbertaInfrastructure
11 Dec 2026
Culvert Replacement and Engineering Services for HWY 756 (Prentice Creek), HWY 761 (Blueberry Creek & Tributary to Wilson Creek), and HWY 22 (Cattlepass) – Alberta TransportationInfrastructure
19 Nov 2026
Construction of 3.2 km Clay-Capped Municipal Road on Township Road 202 – RM of Miry Creek No. 229Infrastructure
07 Dec 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Cutbank Rural Pipeline Utility — Water Treatment Plant Upgrade and Reservoir Expansion, RM of Loreburn, SaskatchewanWater & Sanitation
26 Nov 2026
Erosion Protection with Stone Rip-Rap — Joubert Creek Extension, La BroquerieInfrastructure
09 Dec 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far