Shoreline Erosion Protection Construction at McGregor Reservoir Phase 2
Awarded 01 Nov 2024
About
Alberta Transportation and Economic Corridors awarded a contract to Ironclad Earthworks Ltd.
for the construction of shoreline erosion protection at McGregor Reservoir Phase 2 – Sunset Marks and Monner, part of the Carseland Bow River Headworks System Major Capital Projects.
The work includes approximately 1 lump sum care of water, 4,800 metres of temporary construction fence, 1 lump sum existing and temporary roads, 16,000 cubic metres of site clearing and grubbing, 85,000 cubic metres of topsoil stripping, 10,500 cubic metres of common excavation, 10,500 cubic metres of pitrun gravel – 4C, 10,700 cubic metres of bedding gravel – 5B, 39,500 cubic metres of riprap – 6B Modified, 500 metres of 300mm dia.
PVC pipe, 22,000 square metres of erosion control blanket, 9.0 hectares of drill seeding, 50 cubic metres of access trail, and 100 metres of Paige wire fence, with the contractor supplying all materials.
The contract value is CAD 10,825,035, with substantial performance by March 31, 2025, and total performance by June 1, 2025.
Similar open tenders12
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.





