Shoreline Stabilization of Saint-André Creek in Saint-Philippe
Ville de Saint-Philippe · Awarded contract
AwardedShoreline Stabilization of Saint-André Creek in Saint-Philippe
Awarded 11 Jun 2024
Awarded11 Jun 2024
Value$262,136.08
SupplierL.A. HEBERT LTÉE
AgencyVille de Saint-Philippe
ProvinceQuebec
CategoryInfrastructure
Ended 2y 2mo ago3mo term
Awarded 11 June 2024Expired 11 Sept 2024
About
Ville de Saint-Philippe awarded a contract to L.A.
HEBERT LTÉE for the stabilization of the shoreline of Saint-André Creek in front of 182 and 194, rang Saint-André in Saint-Philippe, under the infrastructure maintenance and repair category, valued at CAD 262,136.08.
Similar open tenders12
TenderCloses
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Water Pipe Rehabilitation, Lead Service Replacement and Road Rehabilitation — chemin de la Côte‑Sainte‑Catherine, avenue Decelles, place Decelles (arrondissement de CDN)Infrastructure
10 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Modifications and Maintenance of Domestic Sewer Infrastructure – Gentilly and Sainte-Angèle-de-LavalWater & Sanitation
03 Dec 2026
Rehabilitation of Pumping Station SP40 at Routes 112 & 116, Saint-Hubert (Longueuil)Water & Sanitation
18 Nov 2026
Replacement of Culvert 130-02A on Rue Sainte-Hélène – Municipality of Saint-SamuelInfrastructure
30 Nov 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Cleaning and Reprofiling of Ditch Beds and Culverts — Chemin Saint-EmmanuelInfrastructure
30 Nov 2026
Rock Face Stabilisation on Chemin de la RivièreInfrastructure
24 Nov 2026
Repair of Structure P-08945 on Rue Saint-Henri over Boulevard Saint-Paul — SaguenayInfrastructure
07 Dec 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
Other similar contracts12
Contract and supplierAwarded value
Slope Stabilization Works at 184, rang Saint-AndréInfrastructureUnivert Excavation Inc.
$34,492.35
Slope Stabilization Works at 175, rang Saint-André in Saint-PhilippeInfrastructureTerrassement Limoges & Fils
$213,473.96
Shoreline Stabilization and Reconstruction along Chemin Lac St-Pierre OuestInfrastructureALIDE BERGERON & FILS LTÉE
$1,254,795.19
Slope Stabilization and Control Works at 145, rang Saint-MarcInfrastructureL.A. Hébert Ltée
$110,075.35
Shoreline Stabilization of the Sainte-Anne River Bank in Saint-Marc-des-CarrièresInfrastructureTRANSPORT GILLES TESSIER INC.
$1,642,942.29
Shoreline Stabilization Construction in Front of 7060 Boulevard des Mille-ÎlesInfrastructureCONSTRUCTION MONCO INC.
$529,877.34
Slope Stabilization Work at 184, rang Saint-AndréInfrastructureUnivert Paysagement Inc. - Division Excavation et Travaux Civils
$31,679.01
Shoreline Stabilization of a Section of the Lemay Watercourse in SherbrookeWater & SanitationGrondin Excavation Inc.
$48,899.89
Road Stabilization Work on Rang Saint-André in Saint-PhilippeInfrastructureGESTION DEXSEN INC.
$231,297.66
Shoreline Stabilization of a Section of the Lemay Watercourse in SherbrookeWater & SanitationGrondin Excavation Inc.
$48,899.89
Shoreline Stabilization Along Chemin du Chenal-du-MoineInfrastructureMÉCANIQUE MOBILE L'ÉCLAIR INC.
$212,331.17
Shoreline Stabilization Work on Chemin du Vieux-Moulin in Notre-Dame-de-l'Île-PerrotInfrastructureIndy-Co inc.
$677,042.62
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far