Slope Stabilization Works at 184, rang Saint-André
Ville de Saint-Philippe · Awarded contract
AwardedSlope Stabilization Works at 184, rang Saint-André
Awarded Unknown
AwardedNot specified
Value$34,492.35
SupplierUnivert Excavation Inc.
AgencyVille de Saint-Philippe
ProvinceQuebec
CategoryInfrastructure
About
Ville de Saint-Philippe awarded a contract to Univert Excavation Inc.
for slope stabilization works facing 184, rang Saint-André, under the infrastructure and civil engineering works category, valued at CAD 34,492.35.
Similar open tenders12
TenderCloses
Slope Stabilization of Tributary Bank on the Mistouk River – St-Coeur-de-MarieInfrastructure
04 Dec 2026
Rock Face Stabilisation on Chemin de la RivièreInfrastructure
24 Nov 2026
Rehabilitation of Nicolet Outfall between Rue Notre‑Dame Est and the St. Lawrence RiverWater & Sanitation
26 Nov 2026
Road Rehabilitation on Various Streets — Montréal (Arrondissement VSL) (PCPR and PRCPR 2027)Infrastructure
17 Dec 2026
Underground Infrastructure Works 2027 — Sewer Rehabilitation by Lining on Various Streets, City of LavalWater & Sanitation
01 Dec 2026
Prevention Works for Highly Retrogressive Landslides on Rivière à Veillet StreamInfrastructure
07 Dec 2026
Repair of Structure P-08945 on Rue Saint-Henri over Boulevard Saint-Paul — SaguenayInfrastructure
07 Dec 2026
Preliminary Design Studies, Plans and Specifications for Route 337 Rehabilitation (A-25 to rue Rodrique) and Culvert 62519 Repair — TerrebonneInfrastructure
07 Dec 2026
Modifications and Maintenance of Domestic Sewer Infrastructure – Gentilly and Sainte-Angèle-de-LavalWater & Sanitation
03 Dec 2026
Road Infrastructure Rehabilitation Works – Îles-de-la-Madeleine (Bas‑Saint‑Laurent–Gaspésie–Îles‑de‑la‑Madeleine)Infrastructure
07 Jan 2027
Enhancement of St-Constant Water Tower — Paving, Asphalting & Infrastructure WorksWater & Sanitation
03 Dec 2026
Replacement of Culvert 130-02A on Rue Sainte-Hélène – Municipality of Saint-SamuelInfrastructure
30 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Slope Stabilization Work at 184, rang Saint-AndréInfrastructureUnivert Paysagement Inc. - Division Excavation et Travaux Civils
$31,679.01
Slope Stabilization Works at 175, rang Saint-André in Saint-PhilippeInfrastructureTerrassement Limoges & Fils
$213,473.96
Slope Stabilization and Control Works at 145, rang Saint-MarcInfrastructureL.A. Hébert Ltée
$110,075.35
Road Stabilization Work on Rang Saint-André in Saint-PhilippeInfrastructureGESTION DEXSEN INC.
$231,297.66
Slope Stabilization Works in Shawinigan-Sud SectorInfrastructureAlide Bergeron et Fils Ltée
$105,049.79
Slope Stabilization of Rang St-MarcInfrastructureROCHETTE EXCAVATION INC.
$109,112.42
Slope Stabilization Work in Shawinigan-Sud SectorInfrastructureAlide Bergeron et Fils Ltée
$92,543.96
Slope Stabilization on Montcalm RoadInfrastructureADV EXCAVATION INC.
$92,207.37
Slope Stabilization Works for Ville de Saint-Jean-sur-RichelieuInfrastructureTetra Tech QI Inc.
$38,658.34
Reconstruction of Rang Saint-André Roadway in Saint-PhilippeInfrastructureUNIVERT PAYSAGEMENT INC.
$1,001,574.17
Shoreline Stabilization of Saint-André Creek in Saint-PhilippeInfrastructureL.A. HEBERT LTÉE
$262,136.08
Slope Stabilization Near 95 Rang de la Rivière NordInfrastructureCONSTRUCTION MONCO INC.
$733,509.1
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far