Wetland Replacement Project on TWP Rd 532A
Parkland County · Awarded contract
AwardedWetland Replacement Project on TWP Rd 532A
Awarded 30 Sep 2024
Awarded30 Sep 2024
Value$17,200.00
SupplierRecharged Industries Inc
AgencyParkland County
ProvinceAlberta
CategoryEnergy & Environment
Expires in 2y 1mo4y 3mo term, 50% elapsed
Awarded 30 Sept 2024Expires 31 Dec 2028
About
Parkland County awarded a contract to Recharged Industries Inc for the TWP Rd 532A Wetland Replacement Project, valued at CAD 17,200.
The project involves wetland replacement as outlined in the RFP deliverables.
Similar open tenders12
TenderCloses
Restoration of Historical Wetland in West Confederation ParkEnergy & Environment
19 Nov 2026
Bridge Replacement on Highway 547 over WID Irrigation Canal near Arrowwood – Southern Region (Alberta)Infrastructure
19 Nov 2026
Bridge Culvert Replacement and Related Works – Range Road 153 over SMRID Canal (Bridge File 84383), West of Purple Springs, ABInfrastructure
26 Nov 2026
Bridge Culvert Replacement – Hwy 22 over Unnamed Watercourse, 2 km N of MayerthorpeInfrastructure
24 Nov 2026
M.D. of Provost Gravel Road Rehabilitation – 10 Miles (2027 Construction Season)Infrastructure
24 Nov 2026
Remediation and 205m Drainage Channel Realignment — Rural Municipality of Montcalm (Manitoba)Water & Sanitation
01 Dec 2026
Bridge Rehabilitation – Hwy 88 over Wabasca River (Km 51.445), Peace RegionInfrastructure
16 Dec 2026
Engineering Consulting Services for Roads and Bridges — Parkland County Pre-Qualification (2027–2029)Infrastructure
08 Dec 2026
Road Rehabilitation Design and Engineering Services — Lethbridge County (3 Road Segments)Infrastructure
24 Nov 2026
Full Depth Reclamation and Asphalt Pavement – Hwy 24 to 12 km S of Hwy 901 (km 0.000–16.700)Infrastructure
03 Dec 2026
Construction of 3.2 km Clay-Capped Municipal Road on Township Road 202 – RM of Miry Creek No. 229Infrastructure
07 Dec 2026
Bridge Rehabilitation – Highway 13 over CPKC, WetaskiwinInfrastructure
25 Nov 2026
Other similar contracts12
Contract and supplierAwarded value
Wetland Construction at Future Strathcona County Regional ParkConstructionSureway Construction Management Ltd
$999,192.35
Engineering Services for Wetland Replacement Project at Strathcona County Regional ParkConsultancy & LegalBarr Engineering and Environmental Science Canada Ltd.
$107,920
Wetland Restoration Project 2024 in Sturgeon CountyEnergy & EnvironmentRecharged Industries Inc.
$66,889.4
Rehabilitation of TWP Road 472 in Wetaskiwin County No. 10InfrastructureMagnum Infrastructure
$641,595.82
Wabamun Concrete Pad and Swale Development Awarded to RDE GroupConstructionRDE Group
$94,958.55
Engineering Consulting Services for Range Road 35 Reconstruction in Parkland CountyInfrastructureWSP Canada Inc.
$38,770.41
Road Upgrade and Bridge File Replacement (TWP 250 Phase 1) by Wheatland CountyInfrastructureFarmboy Landscaping & Maintenance
$1,241,264.46
Drainage Improvements on Range Road 243 by County of Wetaskiwin No. 10Water & SanitationPrairie Erectors Int'l. Inc.
$839,115
Engineering Consulting Services for 2026 ACP Road Rehabilitation by Parkland CountyConsultancy & LegalWSP Canada Inc.
$233,030.57
Rehabilitation of TWP Road 554 from HWY 2 to RR 255InfrastructureE. Construction., a Division of Colas Western Canada Inc.
$4,533,345.71
Stormwater Pond Refurbishment with CSP Line Replacement for Leduc CountyWater & SanitationTerraPro Inc.
$920,790.35
Road Upgrade of TWP 222 from HWY 24 to RR 262InfrastructurePME Inc.
$1,750,243.33
GovMarket
We do the hard work.
You win the work.
We find the tenders, read the documents and track who wins, so your time goes on bids you can win.
–open energy and environment tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month
Revenue from government work$312K won so far





