Alberta Forestry and Parks · Alberta Purchasing
Open

Tender: Canmore Area Trails Master Plan Phase 1 — Trail Design and Construction Administration (Highline, Montane, CNC, BVRA East)

Released 8 days ago

Closes09 Dec 2026
Likely valueEstimate$80K to $350K
LocationAlberta
SourceAlberta Purchasing
CategoryInfrastructure
Reference27PAR8026
20 days leftCloses Wed, 9 Dec 2026

AFP is seeking a consultant to deliver trail design and construction administration services to implement Phase 1 of the Canmore Area Trails Master Plan in the Highline, Montane, CNC, and BVRA East implementation areas. The scope includes complete field layout and detailed design for Phase 1; support during contractor procurement and tendering including responding to bidder inquiries and preparing finalized Issued for Construction (IFC) drawings and associated design documentation; development of standardized signage templates and a detailed Phase 1 signage plan refined through workshops, stakeholder engagement, and AFP review in accordance with CATMP Appendix D; preparation of trail network mapping in ArcGIS format; identification of efficiencies for maintenance and operations; supplemental tender support to review or supplement draft tender documents provided by AFP; and construction administration services acting as the primary design representative from project initiation through construction completion, project close-out, and warranty.

Tender breakdown

From 1 document
trail design & construction administrationPeriod contract
Stage 2 Fee Allowance $30,000.00; Maximum Upset Amount for Stage 2 $30,000.00; overall maximum upset amounts to be provided in Bidder’s fee proposal (not stated)stated value
TodayQuestions close3 DecCloses9 DecComplete30 Nov
Watch out for7

Large field layout scope: 55 km proposed + 21 km improvements with grade flagging every 10 m and detailed intersection pin-flagging (assume 50 intersections)

Stage-based maximum upset amounts control payments; you must price hourly to upset limits and cannot transfer fees between stages without approvals

Approval securement costs and third-party fees are the Consultant’s responsibility and must be invoiced with proof of payment

Pulled from the tender documents by AI and may miss or misread details. Always check the official documents before you bid.

Documents1

Grouped by what each file is for

Tender documents1The main request: what they want, how to respond and the rules.

GovMarket

We do the hard work.
You win the work.

We find the tenders, read the documents and track who wins, so your time goes on bids you can win.

–open infrastructure tenders right now
–new in the last 7 days
–contracts awarded in the last 12 months
7 days free, then $59/CAD per month